My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 05-18-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
05-18-2020
>
8.2. SR 05-18-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 9:39:12 AM
Creation date
5/15/2020 9:38:18 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/18/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />! <br />Ixz!27:!Sfefgjof!!Vujmjuz!SfmpdbujpoQsjwbuf!Efwfmpqnfou!Tfswjdft <br />The overall scope of the needed utility relocation work The city is currently scheduled to complete the <br />inspection and needed project management on three <br />sanitary sewer crossing that will require the construction support on these projects, or if any additional private <br />Street due to the proposed grade separation. With our provide any additional project management or inspection <br />services as needed. <br />the work needed to complete these utility relocations in <br />Hfofsbm!Tdpqf!Ubtlt; Inspection and project <br />management <br />Hfofsbm!Tdpqf!Ubtlt; Planning, design, inspection, <br />Xfflmz!Fohjoffsjoh!Tubgg!Nffujoht <br />and project management <br />Ixz!27:!Sfefgjof!!Gspoubhf! <br />discuss project status and work plans for each coming <br />Dpoofdujpot <br />week. <br />The overall scope of the needed frontage road <br />Hfofsbm!Tdpqf!Ubtlt; Communication and project <br />management <br />and discussed possible frontage and backage road <br />Njtdfmmbofpvt!Qspkfdu!Ftujnbujoh!boe! <br />Tdpqjoh <br />improvements and the work needed to complete these <br />assist the city in estimating and scoping additional <br />projects to plan, budget, and identify their needs. <br />We understand that this will include meeting state aid <br />requirements. <br />Hfofsbm!Tdpqf!Ubtlt; Planning, scoping, and <br />estimating <br />Hfofsbm!Tdpqf!Ubtlt; Planning, design, inspection, <br />and project management <br />Gvuvsf!Qspkfdut <br />Should additional projects arise during the time our <br />Bdujwf!Fml!Sjwfs!Usbjm!Fyufotjpot <br />and Road Extension, Lincoln Safety Improvements at <br />provide services as requested to assist the city in project <br />seven of these locations as priority connections and are <br />delivery. <br />anticipated to be the general scope of this project. To <br />Hfofsbm!Tdpqf!Ubtlt; Planning, design, inspection, and <br />it is anticipated that federal funds will be applied for by <br />project management <br />the city, and, if awarded, these projects will need to meet <br />federal aid requirements. <br />Hfofsbm!Tdpqf!Ubtlt; Planning, design, inspection, <br />and project management <br />Dpotvmubou!Qspkfdu!Nbobhfs!!!}!!Djuz!pg!Fml!Sjwfs-!Njooftpub <br />
The URL can be used to link to this page
Your browser does not support the video tag.