My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. EDSR 05-18-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2014-2020
>
2020
>
05-18-2020
>
7.2. EDSR 05-18-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 4:56:50 PM
Creation date
5/14/2020 4:24:35 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
5/18/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Energy efficiency measures installed in or on a building include: <br /> b. Facility systems optimization(commissioning/re-commissioning) <br /> c. Facility systems control improvements <br /> d. Process efficiency improvements(CenterPoint Energy <br /> e. Lighting efficiency improvements <br /> f. Heating,ventilation and air conditioning system modifications <br /> g. Exterior envelope improvements <br /> h. Motor and pump efficiency improvements <br /> i. Ground-source heat pump systems used to heat or cool a facility <br /> j. Installation of equipment or devices that use renewable energy sources to <br /> generate electricity or heat or cool a building including solar electricity <br /> (photovoltaic),wind turbine or solar thermal. <br /> Ineligible Fund Uses: <br /> a. Inventory <br /> b. Refinancing of existing debt <br /> c. Working capital <br /> d. Expenditures for the construction and/or renovation of residential units <br /> Micro-Brewery Loan <br /> Purpose: The Micro-Brewery microloan is available to business and property <br /> owners located within the city of Elk River. <br /> Amount: Up to$74,999 of secondary financing not to exceed 20%of the <br /> Total project cost. <br /> Equity: Must have private-sector commitments for 50%of the project cost. <br /> Borrower must provide 10%or more of project financing. <br /> Rate: Fixed at 3%. <br /> Term: Financing with a balloon payment in up to 5-years.Loans maybe <br /> amortized up to the following limits: <br /> 10 years on equipment uses <br /> Extension: In the event that the Borrower is unable to obtain conventional <br /> financing to replace the Microloan at the end of five years,the loan <br /> may be extended up to two additional years at a market rate of <br /> interest. <br /> Criteria: At a minimum,50%of Microloan dollars must be used for the <br /> purchase of equipment. <br /> Loans must be supported by sufficient collateral,which will include <br /> personal guarantees. <br /> rorEeEo er <br /> Page 10 of 23 EDA&City Council Approved August 21,2017 AWR <br />
The URL can be used to link to this page
Your browser does not support the video tag.