Laserfiche WebLink
DocuSign Envelope ID: 18BCC2EB-5C45-4AO3-BBDA-FOAFAF992DFC <br />CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />containing Contractor's signed Certification is attached. <br />In tabulations below, amounts are stated to the nearest dollar. <br />Ebert Construction <br />APPLICATION NO.: 4 <br />APPLICATION DATE: 04/01/20 <br />PERIOD TO: 04/30/20 <br />PROJECT NO.: 19520-0033 <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED <br />FROM PREVIOUS <br />PRESENTLY <br />COMPLETED <br />% <br />BALANCE TO <br />RETAINAGE (IF <br />NUM <br />VALUE <br />APPLICATION (D <br />THIS PERIOD <br />STORED (NOT IN <br />AND STORED TO <br />(G _ C) <br />FINISH (C - G) <br />VARIABLE RATE) <br />+ E) <br />D OR E) <br />DATE <br />1 <br />General Conditions <br />$14,700.00 <br />$7,303.47 <br />$5,410.00 <br />$12,713.47 <br />86.49% <br />$1,986.53 <br />$635.41 <br />2 <br />MPB - Walks - Materials <br />$30,617.00 <br />$744.00 <br />$4,752.00 <br />$5,496.00 <br />17.95% <br />$25,121.00 <br />$273.32 <br />3 <br />MPB - Walks - Labor <br />$44,082.00 <br />$1,071.18 <br />$1,071.18 <br />2.43% <br />$43,010.82 <br />$54.01 <br />4 <br />MPB - Curb - Materials <br />$18,273.00 <br />$2,180.00 <br />$2,180.00 <br />11.93% <br />$16,093.00 <br />$109.00 <br />5 <br />MPB - Curb - Labor <br />$22,333.00 <br />$2,664.00 <br />$2,664.00 <br />11.93% <br />$19,669.00 <br />$133.00 <br />6 <br />Lion - Walks - Materials <br />$83,053.00 <br />$3,232.00 <br />$3,232.00 <br />3.89% <br />$79,821.00 <br />$161.60 <br />7 <br />Lion - Walks - Labor <br />$123,318.00 <br />- <br />$123,318.00 <br />- <br />8 <br />Lion - Curb - Materials <br />$18,461.00 <br />$13,846.75 <br />$13,846.75 <br />75.01 % <br />$4,614.25 <br />$692.04 <br />9 <br />Lion - Curb - Labor <br />$22,563.00 <br />$16,922.25 <br />$16,922.25 <br />75.00% <br />$5,640.75 <br />$846.01 <br />10 <br />Allowance <br />$10,000.00 <br />$5,659.00 <br />$5,659.00 <br />56.59% <br />$4,341.00 <br />$283.00 <br />1 <br />Site Concrete (CO #1) <br />$3,311.40 <br />$3,311.40 <br />$3,311.40 <br />100.00% <br />$166.00 <br />1 <br />Site Concrete (CO#2) <br />($1,570.47) <br />($1,570.47) <br />($1,570.47) <br />100.00% <br />($79.00) <br />1 <br />Site Concrete (CO #3) <br />($4,286.00) <br />($4,286.00) <br />($4,286.00) <br />100.00% <br />($214.00) <br />1 <br />Site Concrete (CO #4) <br />($1,561.90) <br />($1,561.90) <br />($1,561.90) <br />100.00% <br />($78.00) <br />PAYMENT TOTALS <br />$383,293.03 <br />$46,283.68 <br />$5,410.00 <br />$7,984.00 <br />$59,677.68 <br />15.57% <br />$323,615.35 <br />$2,982.39 <br />Page 1 of 1 <br />