Laserfiche WebLink
DocuSign Envelope ID: 18BCC2EB-5C45-4AO3-BBDA-FOAFAF992DFC <br />NTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />containing Contractor's signed Certification is attached. <br />In tabulations below, amounts are stated to the nearest dollar. <br />Rink-Tec International Inc. <br />APPLICATION NO.: 9 <br />APPLICATION DATE: 04/21/20 <br />PERIOD TO: 04/30/20 <br />PROJECT NO.: 19520-0033 <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED <br />FROM PREVIOUS <br />PRESENTLY <br />COMPLETED <br />% <br />BALANCE TO <br />RETAINAGE (IF <br />NUM <br />VALUE <br />APPLICATION (D <br />THIS PERIOD <br />STORED (NOT IN <br />AND STORED TO <br />(G + C) <br />FINISH (C - G) <br />VARIABLE RATE) <br />+ E) <br />D OR E) <br />DATE <br />1 <br />Bonding/Insurance/Permits <br />$60,000.00 <br />$60,000.00 <br />$60,000.00 <br />100.00% <br />$3,000.00 <br />2 <br />Mobilization <br />$35,000.00 <br />$35,000.00 <br />$35,000.00 <br />100.00% <br />$1,750.00 <br />3 <br />Reclaim & Demo Equipment <br />$20,000.00 <br />$20,000.00 <br />$20,000.00 <br />100.00% <br />$1,000.00 <br />Room #1 <br />4 <br />Rink #1 Saw Cutting/Removal <br />$60,000.00 <br />$60,000.00 <br />$60,000.00 <br />100.00% <br />$3,000.00 <br />5 <br />Rink #1 Mains & Insulation <br />$40,000.00 <br />$40,000.00 <br />$40,000.00 <br />100.00% <br />$2,000.00 <br />6 <br />Rink #1 Subfloor System <br />$15,000.00 <br />$15,000.00 <br />$15,000.00 <br />100.00% <br />$750.00 <br />7 <br />Rink #1 Granular & Fine <br />$30,000.00 <br />$30,000.00 <br />$30,000.00 <br />100.00% <br />$1,500.00 <br />Grading <br />8 <br />Rink #1 Floor Insulation <br />$44,000.00 <br />$44,000.00 <br />$44,000.00 <br />100.00% <br />$2,200.00 <br />9 <br />Rink #1 Chairs/Vapor Barrier <br />$35,000.00 <br />$35,000.00 <br />$35,000.00 <br />100.00% <br />$1,750.00 <br />/Expansion <br />10 <br />Rink #1 Rebar/Mesh <br />$40,000.00 <br />$40,000.00 <br />$40,000.00 <br />100.00% <br />$2,000.00 <br />11 <br />Rink #1 Headers & Tubing <br />$100,000.00 <br />$100,000.00 <br />$100,000.00 <br />100.00% <br />$5,000.00 <br />12 <br />Rink #1 Concrete Placement <br />$90,000.00 <br />$90,000.00 <br />$90,000.00 <br />100.00% <br />$4,500.00 <br />/Finishing <br />13 <br />Rink #2 Mains & Insulation <br />$40,000.00 <br />$40,000.00 <br />$40,000.00 <br />100.00% <br />$2,000.00 <br />14 <br />Rink #2 Subfloor System <br />$15,000.00 <br />$15,000.00 <br />$15,000.00 <br />100.00% <br />$750.00 <br />15 <br />Rink #2 Granular & Fine <br />$30,000.00 <br />$30,000.00 <br />$30,000.00 <br />100.00% <br />$1,500.00 <br />Grading <br />16 <br />Rink #2 Floor Insulation <br />$44,000.00 <br />$44,000.00 <br />$44,000.00 <br />100.00% <br />$2,200.00 <br />17 <br />Rink #2 Chairs/Vapor Barrier <br />$35,000.00 <br />$35,000.00 <br />$35,000.00 <br />100.00% <br />$1,750.00 <br />/Expansion <br />18 <br />Rink #2 Rebar/Mesh <br />$40,000.00 <br />$40,000.00 <br />$40,000.00 <br />100.00% <br />$2,000.00 <br />19 <br />Rink #2 Headers & Tubing <br />$100,000.00 <br />$100,000.00 <br />$100,000.00 <br />100.00% <br />$5,000.00 <br />20 <br />Rink #2 Concrete Placement <br />$90,000.00 <br />$90,000.00 <br />$90,000.00 <br />100.00% <br />$4,500.00 <br />/Finishing <br />21 <br />Compressor/Chiller/Pumps <br />$349,742.00 <br />$349,742.00 <br />$349,742.00 <br />100.00% <br />$17,487.10 <br />/Condenser <br />22 <br />MCC/Electrical <br />$120,000.00 <br />$95,000.00 <br />$25,000.00 <br />$120,000.00 <br />100.00% <br />$6,000.00 <br />PAYMENT TOTALS <br />$2,162,742.00 <br />$1,717,742.00 <br />$175,000.00 <br />$1,892,742.00 <br />87.52% <br />$270,000.00 <br />$94,637.10 <br />Page 1 of 2 <br />