Laserfiche WebLink
DocuSign Envelope ID: 18BCC2EB-5C45-4AO3-BBDA-FOAFAF992DFC <br />NTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />containing Contractor's signed Certification is attached. <br />In tabulations below, amounts are stated to the nearest dollar. <br />Murphy Window and Door Commercial, Inc <br />APPLICATION NO.: 3 <br />APPLICATION DATE: 03/23/20 <br />PERIOD TO: 04/30/20 <br />PROJECT NO.: 19520-0033 <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED <br />FROM PREVIOUS <br />PRESENTLY <br />COMPLETED <br />% <br />BALANCE TO <br />RETAINAGE (IF <br />NUM <br />VALUE <br />APPLICATION (D <br />THIS PERIOD <br />STORED (NOT IN <br />AND STORED TO <br />(G + C) <br />FINISH (C - G) <br />VARIABLE RATE) <br />+ E) <br />D OR E) <br />DATE <br />1 <br />08-900 Curtain Wall & <br />$147,882.52 <br />$26,691.77 <br />$33,579.38 <br />$60,271.15 <br />40.76% <br />$87,611.37 <br />$3,013.56 <br />Storefront Metal <br />2 <br />08-700 Hardware <br />$89,971.20 <br />- <br />$89,971.20 <br />3 <br />08-300 Automatic Entrances <br />$22,578.00 <br />- <br />$22,578.00 <br />4 <br />08-800 Glazing <br />$113,807.50 <br />$43,456.85 <br />$30,318.55 <br />$73,775.40 <br />64.82% <br />$40,032.10 <br />$3,688.77 <br />5 <br />08-950 Brake Metal <br />$7,100.00 <br />$1,999.33 <br />$1,999.33 <br />28.16% <br />$5,100.67 <br />$99.97 <br />6 <br />07-900 Joint Sealers <br />$3,675.73 <br />$1,400.00 <br />$1,400.00 <br />38.09% <br />$2,275.73 <br />$70.00 <br />7 <br />08-050 Misc Fasteners, <br />$3,944.65 <br />$1,000.00 <br />$1,000.00 <br />25.35% <br />$2,944.65 <br />$50.00 <br />Shims, Backer Rod <br />8 <br />01-542 Man Lifts, Storage, & <br />$25,560.00 <br />$4,415.40 <br />$8,127.85 <br />$12,543.25 <br />49.07% <br />$13,016.75 <br />$627.16 <br />Equipment <br />9 <br />01-750 Bonds & Insurance <br />$14,200.00 <br />$14,200.00 <br />$14,200.00 <br />100.00% <br />$710.00 <br />10 <br />01-010 Refundable Allowance <br />$7,500.00 <br />- <br />$7,500.00 <br />- <br />11 <br />08-910 Shop Drawings <br />$9,958.00 <br />$9,958.00 <br />$9,958.00 <br />100.00% <br />$497.90 <br />12 <br />08-920 Structural Calcs <br />$17,569.20 <br />$17,569.20 <br />$17,569.20 <br />100.00% <br />$878.46 <br />13 <br />08-930 Field Installation Labor <br />$119,253.20 <br />$11,907.97 <br />$25,713.28 <br />$37,621.25 <br />31.55% <br />$81,631.95 <br />$1,881.06 <br />14 <br />01-770 Mobilization <br />$18,000.00 <br />$18,000.00 <br />$18,000.00 <br />100.00% <br />$900.00 <br />1 <br />Glass and Glazing (CO #1) <br />$43,100.00 <br />- <br />$43,100.00 <br />- <br />PAYMENT TOTALS <br />$644,100.00 <br />$150,598.52 <br />$97,739.06 <br />$248,337.58 <br />38.56% <br />$395,762.42 <br />$12,416.88 <br />Page 1 of 1 <br />