Laserfiche WebLink
DocuSign Envelope ID: 18BCC2EB-5C45-4AO3-BBDA-FOAFAF992DFC <br />NTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />containing Contractor's signed Certification is attached. <br />In tabulations below, amounts are stated to the nearest dollar. <br />Schwickert's Tecta America, LLC <br />APPLICATION NO <br />APPLICATION DATE: 04/22/20 <br />PERIOD TO: 04/30/20 <br />PROJECT NO.: 19520-0033 <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED <br />FROM PREVIOUS <br />PRESENTLY <br />COMPLETED <br />% <br />BALANCE TO <br />RETAINAGE (IF <br />NUM <br />VALUE <br />APPLICATION (D <br />THIS PERIOD <br />STORED (NOT IN <br />AND STORED TO <br />(G + C) <br />FINISH (C - G) <br />VARIABLE RATE) <br />+ E) <br />D OR E) <br />DATE <br />1 <br />Insurance/Bonds <br />$12,574.00 <br />$12,574.00 <br />$12,574.00 <br />100.00% <br />$628.70 <br />2 <br />Shop Drawings <br />$11,211.00 <br />$11,211.00 <br />$11,211.00 <br />100.00% <br />$560.55 <br />3 <br />Mobilzation/Equipment <br />$11,710.00 <br />- <br />$11,710.00 <br />- <br />4 <br />Safety <br />$9,311.00 <br />$9,311.00 <br />5 <br />Walllnsulation/Z-Furring <br />$10,888.00 <br />$10,888.00 <br />Materials <br />6 <br />Wall Insulation/Z-Furring Labor <br />$9,646.00 <br />$9,646.00 <br />7 <br />Solid Phenolic Rainsceen <br />$33,465.00 <br />$33,465.00 <br />Panels Materials <br />8 <br />Solid Phenolic Rainsceen <br />$11,282.00 <br />$11,282.00 <br />Panels Labor <br />9 <br />Solid Phenolic Rainscreen <br />$17,619.00 <br />$17,619.00 <br />Panel Flashing Materials <br />10 <br />Solid Phenolic Rainscreen <br />$8,113.00 <br />$8,113.00 <br />Panel Flashing Labor <br />11 <br />ACM Fabrication Materials <br />$20,003.00 <br />$20,003.00 <br />12 <br />ACM Fabrication Labor <br />$17,519.00 <br />$17,519.00 <br />13 <br />ACM Flashing Materials <br />$5,419.00 <br />$5,419.00 <br />14 <br />ACM Flashing Labor <br />$4,923.00 <br />$4,923.00 <br />15 <br />ACM Inst. Materials (hat <br />$7,241.00 <br />$7,241.00 <br />/fasteners/etc.) <br />16 <br />ACM Inst. Labor <br />$6,491.00 <br />$6,491.00 <br />17 <br />$5,000 Allowance per Contract <br />$5,000.00 <br />$5,000.00 <br />1 <br />Metal Wall Panels (CO #1) <br />($10,955.00) <br />- <br />($10,955.00) <br />PAYMENT TOTALS <br />1 $191,460.00 <br />$23,785.00 <br />1 $23,785.00 <br />1 12.42% <br />$167,675.00 <br />$1,189.25 <br />Page 1 of 1 <br />