Laserfiche WebLink
DocuSign Envelope ID: 18BCC2EB-5C45-4AO3-BBDA-FOAFAF992DFC <br />NTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />containing Contractor's signed Certification is attached. <br />In tabulations below, amounts are stated to the nearest dollar. <br />Top -All Roofing, Inc <br />APPLICATION NO.: 6 <br />APPLICATION DATE: 04/20/20 <br />PERIOD TO: 04/30/20 <br />PROJECT NO.: 19520-0033 <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED <br />FROM PREVIOUS <br />PRESENTLY <br />COMPLETED <br />% <br />BALANCE TO <br />RETAINAGE (IF <br />NUM <br />VALUE <br />APPLICATION (D <br />THIS PERIOD <br />STORED (NOT IN <br />AND STORED TO <br />(G + C) <br />FINISH (C - G) <br />VARIABLE RATE) <br />+ E) <br />D OR E) <br />DATE <br />1 <br />Material Insulation <br />$384,950.00 <br />$384,950.00 <br />$384,950.00 <br />100.00% <br />$19,247.50 <br />2 <br />Material Vapor Barrier <br />$50,600.00 <br />$50,600.00 <br />$50,600.00 <br />100.00% <br />$2,530.00 <br />3 <br />Material EPDM & Accessories <br />$195,960.00 <br />$195,960.00 <br />$195,960.00 <br />100.00% <br />$9,798.00 <br />4 <br />Material Sheet Metal <br />$32,040.00 <br />$20,826.00 <br />$9,612.00 <br />$30,438.00 <br />95.00% <br />$1,602.00 <br />$1,521.90 <br />5 <br />Labor Insulation <br />$80,070.00 <br />$76,063.00 <br />$4,006.00 <br />$80,069.00 <br />100.00% <br />$1.00 <br />$4,003.50 <br />6 <br />Labor Vapor Barrier <br />$21,110.00 <br />$20,055.00 <br />$1,055.00 <br />$21,110.00 <br />100.00% <br />- <br />$1,055.50 <br />7 <br />Labor EPDM & Accessories <br />$148,060.00 <br />$140,657.00 <br />$7,403.00 <br />$148,060.00 <br />100.00% <br />$7,403.00 <br />8 <br />Labor Sheet Metal <br />$29,900.00 <br />$17,940.00 <br />$10,465.00 <br />$28,405.00 <br />95.00% <br />$1,495.00 <br />$1,420.25 <br />9 <br />Allowance for Conditions <br />$45,000.00 <br />$18,789.00 <br />$18,789.00 <br />41.75% <br />$26,211.00 <br />$939.45 <br />10 <br />Bonding <br />$33,000.00 <br />$33,000.00 <br />$33,000.00 <br />100.00% <br />$1,650.00 <br />1 <br />Roofing (CO #1) <br />$2,060.00 <br />$2,060.00 <br />$2,060.00 <br />100.00% <br />$103.00 <br />1 <br />Roofing (CO #2) <br />($12,000.00) <br />($12,000.00) <br />($12,000.00) <br />100.00% <br />($600.00) <br />1 <br />Roofing (CO #3) <br />$1,560.00 <br />$1,560.00 <br />$1,560.00 <br />100.00% <br />$78.00 <br />PAYMENT TOTALS <br />$1,012,310.00 <br />$960,900.00 <br />$22,101.00 <br />$983,001.00 <br />97.10% <br />$29,309.00 <br />$49,150.10 <br />Page 1 of 1 <br />