Laserfiche WebLink
DocuSign Envelope ID: 18BCC2EB-5C45-4AO3-BBDA-FOAFAF992DFC <br />NTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />containing Contractor's signed Certification is attached. <br />In tabulations below, amounts are stated to the nearest dollar. <br />Ebert Construction <br />APPLICATION NO.: 6 <br />APPLICATION DATE: 04/23/20 <br />PERIOD TO: 04/30/20 <br />PROJECT NO.: 19520-0033 <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED <br />FROM PREVIOUS <br />PRESENTLY <br />COMPLETED <br />% <br />BALANCE TO <br />RETAINAGE (IF <br />NUM <br />VALUE <br />APPLICATION (D <br />THIS PERIOD <br />STORED (NOT IN <br />AND STORED TO <br />(G + C) <br />FINISH (C - G) <br />VARIABLE RATE) <br />+ E) <br />D OR E) <br />DATE <br />1 <br />Bonds, Insurance, Mobilize <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />100.00% <br />$250.00 <br />2 <br />General Conditions <br />$21,000.00 <br />$11,550.00 <br />$1,050.00 <br />$12,600.00 <br />60.00% <br />$8,400.00 <br />$630.00 <br />3 <br />Allowance <br />$50,000.00 <br />$12,882.39 <br />$8,473.36 <br />$21,355.75 <br />42.71% <br />$28,644.25 <br />$1,067.79 <br />4 <br />061000 Rough Carpentry M <br />$59,700.00 <br />$59,700.00 <br />$59,700.00 <br />100.00% <br />$2,985.00 <br />5 <br />061000 Rough Carpentry L <br />$153,000.00 <br />$122,400.00 <br />$10,710.00 <br />$133,110.00 <br />87.00% <br />$19,890.00 <br />$6,655.50 <br />6 <br />061753 Shop Fam Wood <br />$3,000.00 <br />$3,000.00 <br />$3,000.00 <br />100.00% <br />$150.00 <br />Trusses <br />7 <br />064216 Wood Paneling <br />$135,000.00 <br />$20,250.00 <br />$20,250.00 <br />15.00% <br />$114,750.00 <br />$1,012.50 <br />8 <br />072119 Foamed -In -Place <br />$17,000.00 <br />- <br />$17,000.00 <br />- <br />Insulation <br />9 <br />081113 HM Doors and Frames <br />$81,000.00 <br />$8,100.00 <br />$8,100.00 <br />10.00% <br />$72,900.00 <br />$405.00 <br />10 <br />097733 FRP <br />$4,500.00 <br />$4,500.00 <br />$4,500.00 <br />100.00% <br />$225.00 <br />11 <br />101100 Visual Display Boards <br />$7,800.00 <br />- <br />$7,800.00 <br />- <br />12 <br />102600 Wall and Corner <br />$7,000.00 <br />$7,000.00 <br />Guards <br />13 <br />105113 Metal Lockers <br />$2,800.00 <br />$2,800.00 <br />1 <br />Carpentry (CO #1) <br />$416.90 <br />- <br />$416.90 <br />PAYMENT TOTALS <br />$547,216.90 <br />$214,532.39 <br />$53,083.36 <br />$267,615.75 <br />48.91% <br />$279,601.15 <br />$13,380.79 <br />Page 1 of 1 <br />