Laserfiche WebLink
DocuSign Envelope ID: 18BCC2EB-5C45-4AO3-BBDA-FOAFAF992DFC <br />CONTINUATION SHEET <br />Page 2 of 3 <br />Application and Certification for Payment, containing <br />Contractor's signed certification is attached. <br />In tabulations below, amounts are stated to the nearest dollar. <br />Use Column I on Contracts where variable retainage for line items may apply. <br />Invoice # : 9520003310 <br />Contract: 19520-0033 Elk River Multi -Purpose Facility and Lion John Weicht Park <br />Application No.: 10 <br />Application Date: 04/30/20 <br />To: 04/30/20 <br />Architect's Project No.: <br />A <br />B <br />C <br />D E <br />F <br />G <br />H <br />I <br />Item <br />Description of Work <br />Scheduled <br />Work Com <br />leted <br />Materials <br />Total <br />% <br />Balance <br />Retainage <br />From Previous <br />This Period <br />No. <br />Value <br />Presently <br />Completed <br />(G / C) <br />To Finish <br />Application <br />In Place <br />Stored <br />and Stored <br />(C-G) <br />(D+E) <br />To Date <br />Not in D or E <br />D+E+F <br />1 <br />Elk River Multi -Purpose Facility and <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00% <br />0.00 <br />0.00 <br />Lion John Weicht Park <br />1A <br />Final Cleaning <br />80,651.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00% <br />80,651.00 <br />0.00 <br />1B <br />Survey <br />41,280.00 <br />15,637.00 <br />0.00 <br />0.00 <br />15,637.00 <br />37.88% <br />25,643.00 <br />781.85 <br />2A <br />Building Demolition <br />166,199.51 <br />162,199.51 <br />4,000.00 <br />0.00 <br />166,199.51 <br />100.00% <br />0.00 <br />8,309.98 <br />2B <br />Selective Demolition <br />207,918.40 <br />15,482.40 <br />178,713.00 <br />0.00 <br />194,195.40 <br />93.40% <br />13,723.00 <br />9,709.77 <br />3C <br />Concrete Floor Finishes <br />124,022.22 <br />0.00 <br />19,632.22 <br />0.00 <br />19,632.22 <br />15.83% <br />104,390.00 <br />981.61 <br />4A <br />Masonry Systems <br />3,003,739.56 <br />2,756,073.78 <br />44,814.78 <br />0.00 <br />2,800,888.56 <br />93.25% <br />202,851.00 <br />140,044.43 <br />5A <br />Structural Material <br />1,352,108.18 <br />1,035,156.20 <br />170,910.94 <br />0.00 <br />1,206,067.14 <br />89.20% <br />146,041.04 <br />60,303.36 <br />5B <br />Structural Labor <br />445,873.85 <br />309,543.00 <br />41,555.00 <br />0.00 <br />351,098.00 <br />78.74% <br />94,775.85 <br />17,554.90 <br />6A <br />Carpentry <br />1,361,512.73 <br />348,477.65 <br />104,753.65 <br />0.00 <br />453,231.30 <br />33.29% <br />908,281.43 <br />22,661.56 <br />7A <br />Waterproofing &WB <br />38,902.00 <br />30,792.00 <br />0.00 <br />0.00 <br />30,792.00 <br />79.15% <br />8,110.00 <br />1,539.60 <br />7B <br />Roofing Systems <br />1,053,038.00 <br />979,995.19 <br />22,101.00 <br />0.00 <br />1,002,096.19 <br />95.16% <br />50,941.81 <br />50,104.81 <br />7C <br />Metal Wall Panel <br />191,460.00 <br />0.00 <br />23,785.00 <br />0.00 <br />23,785.00 <br />12.42% <br />167,675.00 <br />1,189.25 <br />8A <br />Aluminum Entrances/Storefronts <br />644,100.00 <br />152,608.62 <br />95,728.96 <br />0.00 <br />248,337.58 <br />38.56% <br />395,762.42 <br />12,416.88 <br />8B <br />Overhead Coiling and Sectional Doors <br />53,260.00 <br />0.00 <br />8,575.00 <br />0.00 <br />8,575.00 <br />16.10% <br />44,685.00 <br />428.75 <br />9A <br />Gypsum Board <br />333,850.20 <br />12,231.28 <br />181,723.05 <br />0.00 <br />193,954.33 <br />58.10% <br />139,895.87 <br />9,697.71 <br />9B <br />Tiling <br />138,480.00 <br />0.00 <br />74,138.00 <br />0.00 <br />74,138.00 <br />53.54% <br />64,342.00 <br />3,706.90 <br />9C <br />Acoustical Ceilings <br />134,305.00 <br />2,250.00 <br />38,035.00 <br />0.00 <br />40,285.00 <br />30.00% <br />94,020.00 <br />2,014.25 <br />9D <br />Flooring <br />103,900.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00% <br />103,900.00 <br />0.00 <br />9E <br />Painting <br />422,750.00 <br />94,000.00 <br />64,363.00 <br />0.00 <br />158,363.00 <br />37.46% <br />264,387.00 <br />7,918.15 <br />1OA <br />Signage <br />50,340.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00% <br />50,340.00 <br />0.00 <br />11A <br />Athletic Equipment <br />173,574.91 <br />65,773.46 <br />98,534.90 <br />0.00 <br />164,308.36 <br />94.66% <br />9,266.55 <br />8,215.43 <br />11B <br />Concessions <br />101,740.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00% <br />101,740.00 <br />0.00 <br />12A <br />Roller Shades <br />27,886.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00% <br />27,886.00 <br />0.00 <br />13B <br />Ice Rink Systems <br />2,162,742.00 <br />1,717,742.00 <br />175,000.00 <br />0.00 <br />1,892,742.00 <br />87.52% <br />270,000.00 <br />94,637.10 <br />13C <br />Leg Truss System <br />125,797.00 <br />125,797.00 <br />0.00 <br />0.00 <br />125,797.00 <br />100.00% <br />0.00 <br />6,289.85 <br />14A <br />Elevators <br />69,875.00 <br />39,750.00 <br />0.00 <br />0.00 <br />39,750.00 <br />56.89% <br />30,125.00 <br />1,987.50 <br />21A <br />Fire Protection <br />268,440.00 <br />210,630.00 <br />11,562.00 <br />0.00 <br />222,192.00 <br />82.77% <br />46,248.00 <br />11,109.62 <br />22A <br />Plumbing Systems <br />1,278,978.00 <br />743,741.00 <br />145,000.00 <br />0.00 <br />888,741.00 <br />69.49% <br />390,237.00 <br />44,437.05 <br />23A <br />HVAC <br />1,834,699.93 <br />1,337,024.18 <br />0.00 <br />0.00 <br />1,337,024.18 <br />72.87% <br />497,675.75 <br />66,851.21 <br />26A <br />Electrical Systems <br />1,776,889.20 <br />988,692.07 <br />313,000.00 <br />0.00 <br />1,301,692.07 <br />73.26% <br />475,197.13 <br />65,084.60 <br />31A <br />Multipurpose Earthwork <br />692,362.30 <br />600,363.34 <br />20,000.00 <br />0.00 <br />620,363.34 <br />89.60% <br />71,998.96 <br />31,018.17 <br />