Laserfiche WebLink
DocuSign Envelope ID: 18BCC2EB-5C45-4AO3-BBDA-FOAFAF992DFC <br />NTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />containing Contractor's signed Certification is attached. <br />In tabulations below, amounts are stated to the nearest dollar. <br />High Five Erectors II, Inc. <br />APPLICATION NO.: 6 <br />APPLICATION DATE: 04/24/20 <br />PERIOD TO: 04/30/20 <br />PROJECT NO.: 19520-0033 <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED <br />FROM PREVIOUS <br />PRESENTLY <br />COMPLETED <br />% <br />BALANCE TO <br />RETAINAGE (IF <br />NUM <br />VALUE <br />APPLICATION (D <br />THIS PERIOD <br />STORED (NOT IN <br />AND STORED TO <br />(G + C) <br />FINISH (C - G) <br />VARIABLE RATE) <br />+ E) <br />D OR E) <br />DATE <br />1 <br />051200 Structural Steel <br />$129,841.00 <br />$129,841.00 <br />$129,841.00 <br />100.00% <br />$6,492.05 <br />2 <br />052100 Steel Joists <br />$100,523.00 <br />$100,523.00 <br />$100,523.00 <br />100.00% <br />$5,026.15 <br />3 <br />053100 Steel Decking <br />$45,888.00 <br />$45,888.00 <br />$45,888.00 <br />100.00% <br />$2,294.40 <br />4 <br />055000 Metal Fabrications <br />$8,508.00 <br />- <br />$8,508.00 <br />5 <br />055100 Metal Pan Stairs <br />$43,996.00 <br />$10,999.00 <br />$10,999.00 <br />$21,998.00 <br />50.00% <br />$21,998.00 <br />$1,099.90 <br />6 <br />055213 Pipe & Tube Railings <br />$71,614.00 <br />$21,484.00 <br />$21,484.00 <br />30.00% <br />$50,130.00 <br />$1,074.20 <br />7 <br />Allowance <br />$30,000.00 <br />$15,438.15 <br />$422.00 <br />$15,860.15 <br />52.87% <br />$14,139.85 <br />$793.01 <br />8 <br />Bond <br />$5,380.00 <br />$5,380.00 <br />- <br />$5,380.00 <br />100.00% <br />$269.00 <br />1 <br />Structural Steel Erection (CO <br />$4,190.00 <br />$4,190.00 <br />$4,190.00 <br />100.00% <br />$209.50 <br />#1) <br />1 <br />Structural Steel Erection (CO <br />($6,888.15) <br />($6,888.15) <br />($6,888.15) <br />100.00% <br />($344.41) <br />#2) <br />1 <br />Structural Steel Erection (CO <br />$500.00 <br />$500.00 <br />$500.00 <br />100.00% <br />$25.00 <br />#3) <br />1 <br />Structural Steel Erection (CO <br />$672.00 <br />$672.00 <br />$672.00 <br />100.00% <br />$33.60 <br />#4) <br />1 <br />Structural Steel Erection (CO <br />$3,000.00 <br />$3,000.00 <br />$3,000.00 <br />100.00% <br />$150.00 <br />#5) <br />1 <br />Structural Steel Erection (CO <br />$8,650.00 <br />$8,650.00 <br />$8,650.00 <br />100.00% <br />$432.50 <br />#6) <br />PAYMENT TOTALS <br />1 $445,873.85 <br />$309,543.00 <br />$41,555.00 <br />1 $351,098.00 <br />1 78.74% <br />$94,775.85 <br />1 $17,554.90 <br />Page 1 of 1 <br />