My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5.A SWCSR 04-23-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Sherburne Wright Cable Commission
>
SWC Packets
>
2020
>
04-23-2020
>
5.5.A SWCSR 04-23-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 2:12:02 PM
Creation date
5/11/2020 2:12:02 PM
Metadata
Fields
Template:
City Government
type
SWCSR
date
4/23/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River Multi Purpose Facility and Buffalo Fire Department Time-lapse <br />The Commission provided Elk River with 3 special time lapse construction cameras to document <br />the different phases of building the inside and outside of their new facility. We helped them <br />mount the first camera last fall on a telephone pole near the football field. the second and third <br />cameras were mounted inside the buildings. <br />Elk River periodically posts updates on their city Facebook page so that residents can see the <br />progress. The commission is in the process of mounting a camera for the start of construction on <br />the new Buffalo Fire Department which is going up across from City Hall. <br /> <br />Zoom <br />By now most of you are old Zoom pro's. In the beginning of the pandemic we went from city to <br />city and helped cities with connections to the cable system so that they could connect their Zoom <br />meetings (or equivalent software) into the control room equipment. If you have further questions <br />or need additional equipment please give me a call. <br />Rockford and Cokato TriCaster Upgrades <br />Since our last meeting we have upgraded the control rooms in both Rockford and Cokato. This <br />included upgrading the TriCasters and completely rebuilding the control room equipment. <br />RockfordCokato <br />3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.