My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 5-12-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
05-12-2020
>
5.3 ERMUSR 5-12-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 11:21:29 AM
Creation date
5/11/2020 11:21:29 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 4 <br />Proposed Rates <br />Changes to rates are generally based on the overall need for revenues and results of the <br />cost-of-service analyses. The projected operating results at existing rates as presented <br />in Section 2 of this report outline the overall revenue needs of the water utility. Section 3 <br />summarizes the cost-of-service results. ERMU recently raised retail water rates effective <br />in 2020. In Section 2 of this report, Table 2-2 shows that the annual change in net position <br />for the water utility ranges from minus 11.6% to minus 36.8% of revenues during the <br />Study Period. Despite the annual operating results, Table 2-3 shows that the estimated <br />cash reserves fall from $7.7 million to $3.9million, but the reserve levels remain well <br />above the ERMU goal for minimum reserves. The cost-of-service results summarized in <br />Section 3 of this report do not indicate that any changes to rates are necessary to address <br />class cost issues. The cost-of-service results are within a reasonable range relative to <br />comparison of revenues and allocated costs by class. Ultimately, the level of capital <br />improvements and debt will have an impact on resulting levels of reserves. ERMU should <br />monitor operating results and reserves on an on-going basis to determine when additional <br />water revenues through a general rate increase are warranted. <br /> <br />-14- <br />205 <br />
The URL can be used to link to this page
Your browser does not support the video tag.