My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 5-12-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
05-12-2020
>
5.3 ERMUSR 5-12-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 11:21:29 AM
Creation date
5/11/2020 11:21:29 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 <br />Table 3-1below summarizes the functional watercosts for the 2019Test Year. <br />The detailed cost functions are shown in Exhibit 3-A. <br /> <br /> <br /> <br />Revenue <br />ComponentRequirement <br />Plant$1,122,360 <br />Distribution1,029,888 <br />Customer96,429 <br />Revenue(11,508) <br />Total$2,237,169 <br />Classification of Costs <br />ERMU <br />classifications.The watercost classifications are described below. <br />Demand Related demand related costs are costs required to meet the overall <br />maximum demand on the system. Demand related costs are predominately <br />associated with facility fixed costs. <br />CommodityRelatedcommodity costs tend to vary with the annual quantity of <br />water produced. <br />Customer Related costs related to serving, metering and billing of individual <br />customers. <br />Revenue Related revenue related costs vary by the amount of revenue received <br />by the utility or are associated with other operating and non-operating revenues. <br />Exhibits 3-B through 3-Dshow the detailed classification of revenue requirements <br />within the plant, distribution and customer functions. <br />-8- <br />189 <br />
The URL can be used to link to this page
Your browser does not support the video tag.