My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 5-12-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
05-12-2020
>
4.1 ERMUSR 5-12-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 11:17:41 AM
Creation date
5/11/2020 11:16:39 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER RULES <br />105 MAIN EXTENSIONS <br />MAIN EXTENSION POLICY <br />The Elk River Municipal Utilities Board of Commissioners shall make the determination as to the <br />feasibility of all water main extension petitions. <br />The design and construction standards of water main facilities shall be approved by the General <br />Manager. <br />When water trunk facilities are proposed to be extended, a feasibility report shall be completed, <br />analyzed <br />and approved by the Elk River Utilities Commission and City Council. Trunk water main facilities shall be <br />financed by assessing the effected property owners. <br />When water main facilities are extended from the trunk system or water distribution system, these water <br />main facilities shall be financed entirely by the developer. In the case of oversizing the water distribution <br />system to accommodate trunk requirement, the Elk River Municipal Utilities will reimburse the developer <br />for the costs of such oversizing. <br />When an easement is required to make a line extension for the purpose of providing water service to a <br />cost to the Elk River Municipal Utilities. <br />MAIN INSTALLATION <br />No water main or main extension will be installed in any street until the same shall have been brought to <br />grade. Connection to the water distribution system will only be allowed when connection to the sewer <br />system is made or arrangements to do so are finalized. <br />106WATER ACCESS FEES& CONNECTION CHARGES <br />When water main facilities are extended into a newly developed area, the following fees, terms, and <br />conditions shall apply. <br />RESIDENTIAL DEVELOPER <br />a)Execute Developers agreement with the City of Elk River. <br />b)Provide 3 (three) plat maps with easements and CADD diskette of plat. <br />c) Payment of $300 per living unit for plat area at time of plotting for Water Access Fee (WAC). <br />d) <br />area and install the same per Elk River Municipal Utilities specifications. <br />RESIDENTIAL HOME BUILDER / OWNER <br />a)Connection and Meter fees per ERMU fee schedule <br />permit must be received before delivery of the water meter will be made. <br />COMMERCIAL /INDUSTRIAL DEVELOPER <br />a)Connection, access and meter fees (See Base Charge List) must be paid and plumbing permit <br />number supplied before delivery of the water meter will be made. The remaining portion of the WAC <br />feewill be paid at this time upon determination of total WAC units. The number of WAC Unites shall <br />be calculated the same as Sewer Availability Charges, as provided in Section 78-189 of The City of <br />Elk River Code of Ordinances. <br />107 TAP SCHEDULE AND CHARGES <br />11 <br />99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.