My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 5-12-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
05-12-2020
>
4.1 ERMUSR 5-12-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 11:17:41 AM
Creation date
5/11/2020 11:16:39 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELECTRIC RULES <br />INSPECTION <br />AFFIDAVITS <br />Any electrical wiring within the service area of Elk River Municipal Utilities requires a Certificate (Affidavit) of <br />Electric Inspection issued and obtained by a licensed Master Electrician or from the State Electrical Inspector. <br />No wiring, devices or equipment for the transmission, distribution, or utilization of electric energy for light, power, <br />radio, television and/or heat shall be installed within or upon any building or structure, or property, nor shall any <br />alteration or addition be made in existing wiring, devices or equipment, without first submitting the Certificate <br />(Affidavit) to the Electrical Inspector. The Certificate (Affidavit) form shall be made in writing by the person, firm, <br />or corporation installing the work, and shall state the premises to be wired with the complete detail of work <br />covered by the Certificate (Affidavit) of Electrical Inspection. A complete set of plans and specifications for <br />installation of wiring, showing the size of all conductors and such other details as may be necessary, shall be <br />furnished to the electrical inspector and/or Elk River Municipal Utilities when required to determine whether the <br />installation, as described, will be in conformation with the requirements of these regulations. <br />CALLING FOR INSPECTION <br />inspection before the work is concealed and a <br />both instances as required. Notify the electrical inspector immediately for his inspection requirements. If the <br />inspector is not notified to make such inspection before the work is concealed, the inspector may require the <br />wiring to be uncovered for proper inspection. <br />CONNECTION REFUSAL <br />Refusal to permit the inspector to properly examine the wiring will be cause for Elk River Municipal Utilities to <br />refuse to connect the premises to electrical service or to discontinue the existing service until such time as the <br />wiring may be inspected. Service connection may also be refused if the wiring is not completed in conformance <br />with the Electric Code as determined by the Electrical Inspector. <br />5 <br />74 <br />
The URL can be used to link to this page
Your browser does not support the video tag.