My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. PCSR 04-28-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2020
>
04-28-2020
>
6.1. PCSR 04-28-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:11:17 PM
Creation date
4/24/2020 9:13:22 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spack Solutions 5 of 6 Line Avenue Residential Development <br />Traffic Assessment <br />Figure 2 — New Site Trips — Future Line Avenue Layout <br />AM Peak Hour <br />° O '° Q ��li O ANN <br />° <br />PM Peak Hour <br />0 <br />J 4 <br />o <br />s p $ n ---. <br />r <br />Daily <br />40 <br />p f t p55�} <br />00 otl o�p \ "Yp <br />As seen in Figures 1 and 2, the highest peak hour volume increase for any movement at an <br />existing intersection due to the new site traffic is ten vehicles. That equates to an increase of <br />approximately one vehicle every six minutes for those movements. Based on these volumes, <br />none of the surrounding intersections are anticipated to be significantly impacted by site traffic. <br />Additionally, the Line Avenue/Main Street intersection was modeled as having Level of Service <br />B and C operations in the peak hours in the 2016 Traffic Impact Study. The amount of traffic <br />being added to that intersection from this development would not be expected to significantly <br />impact those operations under the existing or future roadway configurations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.