My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5. PCSR 04-28-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2020
>
04-28-2020
>
6.5. PCSR 04-28-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:28:06 AM
Creation date
4/22/2020 9:27:27 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Action <br /> <br /> <br />To Item Number <br />Planning Commission 6.5 <br />Agenda Section Meeting Date Prepared by <br />Public Hearings April 28, 2020 Chris Leeseberg, Senior Planner <br />Item Description Reviewed by <br />CSDC Facilities Corporation – 17267 Yale St. NW - Zack Carlton, Planning Manager <br />Conditional Use Permit for Educational Use (Three <br />Reviewed by <br />Rivers Montessori), Case No. CU 20-08 <br /> <br /> <br />Action Requested <br />Recommend, by motion, approval of the Conditional Use Permit with the following conditions to satisfy <br />the standards set forth in Section 30-654: <br />1. The building shall be inspected by the city building official <br />and fire marshal to verify compliance with all building and <br />fire codes and identified violations must be addressed prior <br />to issuance of new building permits for the property. <br />2. No vehicles associated with the school may be parked or <br />queued in the city right-of-way or on a public street. <br />3. An amendment to this Conditional Use Permit will be <br />required for future expansions/additions not shown on the <br />site plan dated May 18, 2020. <br /> <br />Background/Discussion <br />The property is zoned Planned Unit Development (PUD) where <br />Educational Institutions require a Conditional Use Permit (CUP). <br /> <br />The applicant is seeking a CUP to operate a Montessori School in <br />the upper floor of the existing structure located on the parcel. The <br />lower level will maintain commercial operations. The school <br />currently has 80 students enrolled for the 2020-2021 school year. <br />They will have 8-10 full time staff, along with 4-6 volunteers during <br />the day. <br /> <br />Parking and Traffic <br />The ordinance requires 6 parking stalls for the school and 17 stalls <br />for the office space. The site provides 24 in the upper lot and 16 in the lower lot. <br /> <br />The applicant indicates about 65% of the students will be bussed to the site while the other 35% of the <br />students will be driven to the site or approximately 20 cars. The morning drop-off will be less demanding <br />than the afternoon, when students are all typically picked up at once. The applicant has provided two <br />staging exhibits they will be using; neither uses the public street for the queuing of vehicles. <br /> <br /> <br />The Elk River Vision <br />A welcoming community with revolutionary and spirited resourcefulness, exceptional <br />service, and community engagement that encourages and inspires prosperity <br />
The URL can be used to link to this page
Your browser does not support the video tag.