Laserfiche WebLink
PROFESSIONAL SERVICES AGREEMENT Page 3 <br /> <br />Z:\1 - Projects\E\Elk River Econ. Dev. Auth\20200417 Elk River EDA PSA (clean).dotm <br />budget or schedule or from any opinion of probable cost or project schedule prepared by Stantec. Exact costs and times <br />will be determined only when bids have been received for the Project and when the construction work has been <br />performed and payments finalized. <br />ADMINISTRATION OF CONSTRUCTION CONTRACTS: When applicable, Stantec shall provide field services during the <br />construction of the Project only to the extent that such Services are included and defined in this Agreement. The <br />performance of the construction contract is not Stantec’s responsibility nor are Stantec’s field services rendered for the <br />construction contractor's benefit. <br />It is understood and agreed by the Client and Stantec that only work which has been seen during an examination by <br />Stantec can be said to have been appraised and comments on the balance of any construction work are assumptions <br />only. <br />When field services are provided by Stantec, the authority for general administration of the Project shall reside with <br />Stantec only to the extent defined in this Agreement. In such case, Stantec shall coordinate the activities of other <br />consultants employed by the Client, only to the extent that Stantec is empowered to do so by such other consultants’ <br />contracts with the Client. <br />Stantec shall not be responsible for any contractor’s failure to carry out the work in accordance with the contract <br />documents nor for the acts or omissions of any contractor, subcontractor, any of their agents or employees, or any other <br />persons performing any of the work in connection with the Project. When field services are provided, no acceptance by <br />Stantec of the work or services of a construction contractor or other consultants, whether express or implied, shall relieve <br />such construction contractor or other consultants from their responsibilities to the Client for the proper performance of <br />such work or services and further, Stantec shall not be responsible to the Client or to the construction contractor or to the <br />other consultants for the means, methods, techniques, sequences, procedures and use of equipment of any nature <br />whatsoever, whether reviewed by Stantec or not, which are employed by the construction contractor or the other <br />consultants in executing, designing, or administering any phases of the Project, or for placing into operation any plant or <br />equipment or for safety precautions and programs incidental thereto. <br />When field services are provided, Stantec will not be designated as the party responsible for the compliance by others <br />on the construction work site with the purposes or requirements of applicable environmental, occupational health and <br />safety, or similar legislation. The Client shall designate a responsible party, other than Stantec, for the coordination and <br />performance of environmental, occupational health and safety activities on the construction work site as required by <br />applicable legislation and associated regulations. <br />JOBSITE SAFETY: Neither the professional activities of Stantec, nor the presence of Stantec or its employees and <br />subconsultants at a construction site, shall relieve the Client and any other entity of their obligations, duties and <br />responsibilities with respect to job site safety. Subject only to applicable legislation, Stantec and its personnel have no <br />authority to exercise any control over any construction contractor or other entity or their employees in connection with <br />their work or any health or safety precautions. <br />INDEMNITY: Each party will indemnify and save harmless the other from and against all claims, losses, damages, costs, <br />(including legal costs) actions and other proceedings made, sustained, brought or prosecuted in any manner based <br />upon, occasioned by or attributable to any injury, default or damage arising from any negligent act, error, omission or <br />willful misconduct of the indemnifying party, its servants or agents or persons for whom it has assumed responsibility in the <br />performance or purported performance of this AGREEMENT or of any of the Services. <br />LIMITATION OF LIABILITY: It is agreed that the total amount of all claims (including any and all costs associated with such <br />claims such as attorney and expert fees and interest) the Client may have against Stantec under this Agreement or arising <br />from the performance or non-performance of the Services under any theory of law, including but not limited to claims for <br />negligence, negligent misrepresentation and breach of contract, shall be strictly limited to$500,000. As the Client’s sole <br />and exclusive remedy under this Agreement any claim, demand or suit shall be directed and/or asserted only against <br />Stantec and not against any of Stantec’s employees, officers or directors. <br />Stantec’s liability with respect to any claims arising out of this Agreement shall be absolutely limited to direct damages <br />arising out of the Services and Stantec shall bear no liability whatsoever for any consequential loss, injury or damage <br />incurred by the Client, including but not limited to claims for loss of use, loss of profits and loss of markets. <br />Liability of Stantec shall be further limited to such sum as it would be just and equitable for Stantec to pay having regard <br />to the extent of its responsibility for the loss or damage suffered and on the assumptions that all other consultants and all <br />contractors and sub-contractors shall have provided contractual undertakings on terms no less onerous than those set <br />out in this Agreement to the Client in respect of the carrying out of their obligations and have paid to the Client such <br />proportion of the loss and damage which it would be just and equitable for them to pay having regard to the extent of <br />their responsibility. <br />DOCUMENTS: All documents prepared by Stantec or on behalf of Stantec in connection with the Project are instruments <br />of service for the execution of the Project. Stantec retains the property and copyright in these documents, whether the