My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2 SR 04-20-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
04-20-2020
>
8.2 SR 04-20-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 3:44:17 PM
Creation date
4/17/2020 10:54:35 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/20/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOWN CENTER PARK CONCEPT PLAN <br />St. Michael, Minnesota <br />Perimeter Paved <br />'Loop Trail r k A'� Native Planting/Habitat Restoration Aref Boardwalk Overlook, typ <br />Small Picnic <br />Shelter fi--- <br />( 20 Capacity);Winter Skating AArea - <br />--_ Private Development Open Space - <br />FutureExpanded- �. Stormwater Pond, typ. <br />Parking (t 25 Spaces) PROPOSED DEVELOPMENT <br />Wetland Trail System <br />Light, typ., -": - <br />U <br />LEGACY OF ST. MICHAEL-�- <br />Lawn Game Court ASSISTED LIVING _ <br />Proposed Trees, typ. —� <br />Bench,typ. <br />-- <br />- Small Picnic Shelter <br />Capacity)- <br />' _.Pickleball Courts <br />FRANKE RTPKWY NE <br />Large Picnic Shelter�r� <br />/ ( 75 Capacity) /Stage WR4p <br />w Multipurpose Lawn R� <br />oPatio Seating <br />o <br />wFUTURE Restroom/Changing % 1 <br />DEVELOPMENT ROOmBuilding <br />PARCEL Splash Pad <br />Park Plaza Entry& <br />Entrance Sign <br />Patio Seating POND ,I _ a . <br />— <br />v <br />Futu re Expanded ,� Iu PROPOSE DD_EVELOPMENT O <br />_-_ Pat king (180 Spaces) -R_ n �F - <br />Pre-K Play Container U �� HAL I Ii II <br />K-S Play Container � <br />II�1I1 <br />L <br />!_SwingGo tamer <br />_ <br />Spray Fountain t% (� / �O 4 <br />g , Existing Parking -"-� LIBRARY SENIOR DockOverlook <br />_ CENTER - 111 <br />Small Picnic Shelter ,��^r III <br />vll <br />s - ('- 20 Capacity) <br />TOWN CENTER DRIVE NE \ % pace <br />Outdoor Class <br />roomSmall Event <br />Fire Pit <br />i ---�� Trellis Structure <br />' - - Park Entrance Sign <br />Park Plaza Ent <br />Expanded Patio kith Planter Seat Walls <br />SRF is currently working with the City of St. Michael on the <br />planning and development of a new signature destination park <br />adjacent to the their City Hall, Library, and Senior Center as part <br />of their new civic center campus. Park programming elements <br />will include a large multi -purpose open lawn space that will be <br />used for special City events and large group picnicking, a water <br />splash pad and destination play area, a restroom and changing <br />room building, and picnic shelters which can be reserved for small <br />group gatherings. Other amenities that will be added to the park <br />include pickleball courts, a synthetic turf lawn court area, and an <br />expanded patio and seating area to meet the needs of senior <br />center visitors. A looped one -mile trail system is also planned and <br />will be developed around the perimeter of an existing storm pond <br />adjacent to the park - this will be restored as a natural preserve as <br />another feature for visitors to experience at the park. <br />SRF CONSULTING GROUP CITY OF ELK RIVER H Active Elk River Park Improvements 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.