My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. EDSR 04-20-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2014-2020
>
2020
>
04-20-2020
>
7.1. EDSR 04-20-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2020 10:54:46 AM
Creation date
4/17/2020 10:50:11 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
4/20/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />Provide specific approaches, methods, and assumptions that will be utilized to accomplish each <br />work item as listed in Section 3, Part 2. Artists may submit as teams. The EDA, in its sole <br />discretion, may contract with an individual artist or a team. <br /> <br />E. Location, Installation and Future Maintenance <br />Identify the location of the proposed public art project. Provide a proposed schedule from <br />project initiation to final completion. The schedule should include a listing of key tasks within <br />each phase, key milestones and approximate dates, and deliverables. <br /> <br />F. Additional Information <br />Include any other information that is believed to be pertinent, but not specifically requested <br />elsewhere in this RFP. <br /> <br />G. Total Project Cost <br />The compensation to the selected artist(s) will not exceed $20,000. The artist shall be reimbursed <br />between 25-50% of upfront costs for materials and the balance upon satisfactory completion <br />and installation of the artwork. <br /> <br />The artist shall break out the estimated costs as follows: <br />a. Public art piece materials <br />b. Transportation costs <br />c. Installation costs <br />d. Future maintenance costs <br />e. Any other costs or charges deemed relevant by the artist <br /> <br /> <br />Section 5.0 Selection <br /> <br />Process <br />Members of the Project Judging Panel will evaluate and rank all submitted proposals received by <br />December 6, 2019???,July 10, 2020June 19, 2020 after conclusion of this review, the panel will <br />recommend the artist and project to the EDA. The decision will be based on a combination <br />including, but not limited to: ranking, presentation of materials, and other qualifications. The EDA <br />will review the recommendations making a recommendation to the City Council. The City Council <br />will make the final selection of the artist and project to be submitted for grant funding. After <br />determination of grant funding by the Central MN Arts Board, the city will consider whether to <br />move forward with the project considering available funding sources. The artist will be expected to <br />assist in developing a final scope of services and contractual agreement prior to commencing the <br />project. <br /> <br />Disclosure and Disclaimer <br />The city and the EDA reserve the right to waive any irregularity or defect in any submittal or reject <br />any or all proposals. Receipt of responses to this RFP does not obligate the city or EDA to hire any <br />respondent. Neither the city nor the EDA is responsible for any cost incurred by an yone in <br />preparation for a response to this RFP including but not limited to costs associated with preparing a <br />proposal or participating any presentations related to this RFP. The city and the EDA reserve the
The URL can be used to link to this page
Your browser does not support the video tag.