My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.1 SR 04-20-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
04-20-2020
>
9.1 SR 04-20-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 3:44:20 PM
Creation date
4/17/2020 8:46:25 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/20/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of <br />Qk*l <br />River <br />Request for Action <br />To <br />Item Number <br />Mayor and City Council <br />9.1 <br />Agenda Section <br />Meeting Date <br />Prepared by <br />Work Session <br />April 20, 2020 <br />Jenna Fabish, Assistant City Engineer <br />Item Description <br />Reviewed by <br />County State Aid Highway 12 (Main Street/181st <br />Justin Femrite, P.E., Public Works Director <br />Avenue) Reconstruction Project <br />Reviewed by <br />Cal Portner, City Administrator <br />Action Requested <br />No action required. <br />Background/Discussion <br />This summer, Sherburne County plans to reconstruct County State Aid Highway (CSAH) 12 (Main <br />Street/181" Avenue) from the connection near Line Avenue/Zane Street to the Anoka/Sherburne <br />County line. This work will be completed prior to the proposed Twin Lakes Road and Line Avenue <br />improvements (2021) and the 169 Redefine project (2022-2024). <br />The project includes pavement replacement, concrete median construction, left and right turn lanes at <br />road intersections, signal installation at 181" Avenue (CSAH 12) and Twin Lakes Road (CSAH 13) a <br />single lane roundabout at Johnson Street and 181" Avenue (CSAH 12). <br />The concrete median construction will restrict access (right in, right out) to Hillside Park. The park's <br />access modification has been discussed with the Parks and Recreation Commission and the City Council. <br />Several options have been discussed for the Hillside Park access and the county's proposing a right in, <br />right out with a right turn lane. The county would like to provide the city with an option for future access <br />modification to Hillside Park. The option would provide up to $40,000 in construction costs to remove <br />the current access off CSAH 12 to another location. The funding would be available for a 3-year period. <br />Financial Impact <br />None <br />Attachments <br />■ CSAH 12 Layout <br />The Elk River Vision <br />A welcoming community with revolutionary and spirited resourcefulness, exceptional,` 01 e <br />service, and community engagement that encourages and inspires pi ospei l_ y INAMIRE1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.