My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.6 SR 04-20-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
04-20-2020
>
4.6 SR 04-20-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 3:44:05 PM
Creation date
4/17/2020 8:34:30 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/20/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wver <br />April 13, 2020 <br />Rick Foster rick@riversidecompanies.com <br />Riverside Development Company of Princeton sethm@HAA-inc.com <br />19230 Evans St. NW, Suite 115 <br />Elk River, MN 55330 <br />Thank you for your application of the final plat of Hillside Estates Twelfth Addition. City staff has <br />completed their review of the project and has the following comments. <br />1. Sheet 8 — watermain loop shows existing 8" DIP, plan sheet shows 8" HDPE. <br />2. Provide a trail connection to the existing trail in Highlands Park that is located near the end of the <br />1951h Avenue cul-de-sac. <br />3. The stormwater management plans are still under review and stormwater staff will contact the <br />applicant directly with comments. <br />4. If soil disturbance exceeds one acre an issued NPDES permit is required before construction can start. <br />5. The plan shows a dead-end water main on 1951h Avenue. No dead-end mains shall be constructed. All <br />watermains shall be looped per City of Elk River Design Standards Section 3400 - Watermain Design <br />Standards. <br />6. This development is in a groundwater vulnerability area, additional stormwater requirements may be <br />required. <br />7. Lot 4, Block 3 does not appear to be meeting wetland buffer setback requirements based on National <br />Wetland Inventory (NWI) maps. Delineated wetland and 45-foot buffer should be shown on plat and <br />all setbacks should be met. <br />Please respond with updated plans and a response letter. The Final Plat is scheduled to be reviewed by the <br />City Council on April 20, 2020, and satisfaction of the above comments will be included as a condition of <br />approval. <br />Sincerely, <br />r <br />Zack Carlton <br />Planning Manager <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />763.635.1000 <br />ElkRiverMN.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.