My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.J ERMUSR 04-14-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
04-14-2020
>
6.1.J ERMUSR 04-14-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 2:16:26 PM
Creation date
4/13/2020 2:16:26 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES COMMISSION MEETING <br />TO: FROM: <br />ERMU Commission Dave Ninow – Water Superintendent <br />MEETING DATE: AGENDA ITEM NUMBER: <br />April 14, 2020 6.1j <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />Delivered sevennew water meters. <br /> Sealed the water meter, installed an encoder receiver transmitter, and took curb stop <br />ties from threewater services. <br /> Completed 15 BACTI/Total Chlorine Residual Samples <br />o All confirmednegative for Coliform Bacteria <br />o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH <br /> Completed 22 routine fluoride samples <br />o All samples met MDH standards <br />o Submitted MDH Fluoride Report <br />Submitted Discharge Monitoring Report (DMR) for the Diesel Generation Plantto the <br />Minnesota Pollution Control Agency. <br />Completed and submitted the 2019 Water Conservation Report to DNR. <br /> We opened the gates at the Lake Orono Dam on March 16 to meet the demand of <br />increased, incoming water flow from the spring snow melt. The lake level is checked <br />dailyand gates are adjustedaccordinglyto control waterflow. <br /> On March 30 work resumed on the Auburn Street Water Tower Rehabilitation Project. <br />Work on the tower itself should be completed by May 15, at that point the cell phone <br />provider antennas can be reinstalled on the tower. <br />The vacant Water Operator Position was offered to andaccepted byAustin Kremers. He <br />is scheduled to start April 13. <br />The water operators have safely continued daily operation of municipal wellsandwater <br />treatment plants. We continue takingsamplesand testingwater to ensure wemaintain <br />qualitystandardsset by theEPA. <br />ATTACHMENTS: <br /> March 2020 Pumping by Well <br />______________________________________________________________________________ <br />Page 1 of 1 <br />214 <br />
The URL can be used to link to this page
Your browser does not support the video tag.