My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2 ERMUSR 04-14-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
04-14-2020
>
4.2 ERMUSR 04-14-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 2:07:37 PM
Creation date
4/13/2020 2:07:37 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A.10 Financial Reserves Policy <br />1.0Purpose and Summary <br />In order to maintain stable rates and provide reliable services, Elk River Municipal Utilities <br />(ERMU) requires financial buffers in the form of reserves to mitigate changes in costs or <br />operational performance. For ERMU there are two utility funds,the Electric Utility and the <br />Water Utility. These funds shall have separate reserves. Theirreserve balances shall be <br />classified as either Restricted for Debt ServiceorUnrestricted Designated Reserve. <br />The target levels for these reserves shall be determined by the criteria herein.Thesetarget levels <br />and target criteria will be reviewed annually, modified by Utilities Commission to support the <br />long-term goals of ERMU, and adopted with the annual budget. Unless otherwise specified by <br />bond covenants, these reserve balances <br />Policy (policy number 8.20a). <br />2.0Electric Utility Reserve Classifications <br />Restricted For Debt Service: This reserve is established to maintain compliance with bond <br />covenants. <br />The target level for this reserve shall be set atthe level specified by bond covenants. <br />Unrestricted Designated Reserve: This reserve is established to address the short-term financial <br />variability inherent in operating an Electric Utility. Potential sources of this variability include <br />but are not limited to: risks associated with natural disasters, reduction in overall customer usage, <br />changes in total system load resulting from the actions of large customers, failure to achieve <br />budgeted levels of net income, changes in cost of purchased power, changes in interest income, <br />and general operational exposures. <br />The target level for this reserve shall be set atthe sum of 6 months operating expenditures less <br />depreciation and lesspurchase power costs,plus the sum of <br />interest payments, plus one month budgeted average purchase power cost. The balance above <br />this target level shall be unrestricted. <br />1 <br />155 <br />
The URL can be used to link to this page
Your browser does not support the video tag.