My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.7 ERMUSR 04-14-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
04-14-2020
>
2.7 ERMUSR 04-14-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 2:05:06 PM
Creation date
4/13/2020 2:05:06 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II.6. 2018 Energy Information Administration (EIA) Form 861 Data <br />Form EIA-861 collects information on the status of electric power industry participants involved in the <br />generation, transmission, distribution, and sale of electric energy in the United States, its territories, and <br />Puerto Rico. <br />EIA surveys electric power utilities annually through EIA Form 861 to collect electric industry data and <br />subsequently make that data available to the public. In 2014, EIA began publishing reliability statistics in <br />their survey from utility participants; therefore, the Association included EIA reliability statistics in this <br />report for informational purposes. Please note that the following data includes 174 investor-owned, 553 <br />3 <br />rural cooperative, and 389 public power utilities that were large enough to be required to fill out the full <br />EIA 861, not the EIA 861-S form (for smaller entities). In addition, since the collection and release of <br />EIA form data lags by a year, the data provided here is based on the 2018 data that was published in <br />October 1, 2019. Therefore, it is suggested that the aggregate statistics contained herein be used only <br />as an informational tool for further comparison of reliability statistics. <br />In Table 12 and Table 13, an entity calculates SAIDI, SAIFI, and determines major event days in <br />accordance with the IEEE 1366-2003 or IEEE 1366-2012 standard. <br />http://publicpower.org/reliability. Although EIA collected other reliability-related data, the tables below <br />only include SAIDI and SAIFI data. The full set of data can be downloaded at: <br />http://www.eia.gov/electricity/data/eia861/ <br />Table 12. Summary statistics of the SAIDI data collected in 2018 and published in 2019 by EIA <br />IEEE Method <br />AllNo MEDs <br /> Average327.85142.76 <br /> Minimum Value1.130.00 <br /> First Quartile (25th percentile)80.8252.94 <br /> Median Quartile (50th percentile)154.91100.36 <br /> Third Quartile (75th percentile)320.10161.20 <br /> Maximum Value8092.006356.07 <br />Table 13. Summary statistics of the SAIFI data collected in 2018 and published in 2019 by EIA <br />IEEE Method <br />AllNo MEDs <br /> Average1.641.27 <br /> Minimum Value0.030.00 <br /> First Quartile (25th percentile)0.830.65 <br /> Median Quartile (50th percentile)1.331.06 <br /> Third Quartile (75th percentile)2.031.56 <br /> Maximum Value13.0311.31 <br />3389 public power utilities include entities classified by EIA as municipal, political subdivision, and state. <br />10 <br />64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.