My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.2 ERMUSR 04-14-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
04-14-2020
>
2.2 ERMUSR 04-14-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 2:03:19 PM
Creation date
4/13/2020 2:03:19 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2 2019 Annual Report <br />Ms. Canterbury provided some background on how staff had traditionally produced and <br />distributed the annual report. She also went over the changes that staff had implemented to <br />allow for us to now distribute the report to all our customers in a timelier way. <br />Ms. Canterbury presented the 2019 Annual Report and recognized Mr. Mauren for leading <br />the project from start to finish and producing such a nice report. Mr. Mauren shared the <br />, how our <br />values have shaped the services we provide, and the ways we connect with our community. <br />Also highlighted in the report is how 5% rate reduction put $1.78 million back into <br />the pockets of our customers. Chair Dietz complimented staff on the report and suggested we <br />share a copy of the report with the City Council. <br />Moved by Commissioner Stewart and seconded by Commissioner Nadeau to receive and <br />file the 2019 Annual Report. Motion carried 5-0. <br />5.3 7.5 MVA GSU Transformer Bids <br />To prepare for the construction of the new Field Services Building, the existing power plant <br />substation will need to be relocated; the costs associated with the relocation were approved <br />with the 2020 budget/business plan. As the transformer component needed for the <br />relocation was estimated to exceed the threshold dollar amount, and be subject to <br />competitive bidding law, it was noticed for formal bids. The bid opening was March 9, 2020; <br />two bids were received. <br />Mr. Kerzman went over the 7.5 MVA GSU transformer bid tabulation which was distributed at <br />the time of the meeting. He noted that our engineering consultant is working with WEG, and <br />the bidder Dakota Supply Group, to get clarification on the technical specifications of their <br />proposal. Staff recommended awarding the contract for the WEG transformer to the lowest <br />responsible bidder, Dakota Supply Group, for the bid amount of $130,500.00, contingent <br />upon meeting the technical specifications. The commission had a few questions. Staff <br />responded. <br />Attorney Beck stressed the importance of verifying <br />conforms to our specifications, and that the motion to award the contract include that <br />contingency. He also recommended the commission address in their motion what would <br /> <br />Moved by Commissioner Nadeau and seconded by Commissioner Westgaard to award the <br />contract for the 7.5 MVA GSU Transformer, contingent upon verification that it complies <br />with the bid package specifications, to Dakota Supply Group, Inc. for the WEG transformer, <br />for the bid amount of $130,500.00; and in the event it does not conform to the bid package <br />specifications, the commission rejects all bids submitted. Motion carried 5-0. <br /> <br />Elk River Municipal Utilities Commission Meeting Minutes <br />March 10, 2020 <br />Page 4 <br /> <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.