My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 04-06-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
04-06-2020
>
8.2. SR 04-06-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 9:17:08 AM
Creation date
4/3/2020 9:13:35 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/6/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 20 <br /> PROJECT ExPERIENCE <br />SHAKOPEE FIRE STATION <br />SHAKOPEE, MINNESOTA <br />From the early needs assessment meeting to the construction of the new <br />23,000 sf main station, BKV Group worked closely with the fire station task <br />force. The sloped site dictated a multi-level facility with the main lobby, fire <br />administration and training room accessible from the upper plateau. Fire <br />operations and apparatus were designed to be accessible from the lower <br />plateau. <br />TYPE <br />Fire Station <br />SIZE <br />23,000 SF Fire Station <br />COST <br />$5.2 M (combined facility) <br />SCOPE <br />Architecture, Engineering, Interior <br />Design, Landscape Architecture, <br />Construction Administration <br />OWNER’S CONTACT <br />Marv Athman, Former Fire Chief <br />952.233.1502 <br />129 Holmes Street South <br />Shakopee, MN 55379
The URL can be used to link to this page
Your browser does not support the video tag.