Laserfiche WebLink
ALL STATE <br />COMMUIVICATIOIVS <br />March 05, 2020 <br />Brandon Wisner <br />City of Elk River <br />Re: Adjusted budget proposal for low voltage cabling at the multipurpose building <br />Material price $29,775.00 <br />Labor price $34,781.00 <br />Total price $64,556.00 <br />Scope of work includes: <br />• Install 1 cat 6 plenum rated cable to each of the 52 new WAP locations <br />• Install 1 cat 6 plenum rated cable to each of the 49 new camera locations <br />• Install 1 cat 6 plenum rated cable to each of the 14 single locations <br />• Install 2 cat 6 plenum rated cables to each of the 61 dual locations <br />• Install 2 cat 6 plenum rated cables to the elevator equipment room <br />• Install 1 RG6 coax and 1 cat 6 cable to each of the 7 television locations <br />o Upper lobby, lower lobby, and above fire place in the senior center <br />• Install of cabling between score boards and score keepers table (type to be <br />determined) <br />• Terminate cables with a jack and biscuit box at all WAP and camera locations <br />• Terminate wall locations with jacks and faceplates <br />• Install a 2 post rack with vertical and horizontal wire management in the main <br />closet <br />• Install a wall mount cabinet in storage room <br />• Install 6 strand single mode fiber and RG- I I backbone cabling between data <br />closets <br />• Re-route existing city owned fiber to new main closet <br />• Terminate fiber with LC connectors <br />• Terminate cables on new patch panels in the data closets <br />• Testing of new cabling included <br />• Patch cords and installation them is not included <br />If you have any further questions on this pricing let me know, <br />Pete Helmin <br />All State Communications <br />320-333-8130 <br />800 Industrial Drive • Suite 204 • Sauk Rapids, MN 56379 <br />Business (320) 203-1511 • Fax (320) 203-1510 <br />