Laserfiche WebLink
<br /> <br />The Bank of Elk River <br />Headquarters <br />Minnesota <br /> <br /> <br />Square footage estimates - total bui'fdingarea <br /> <br />Basement <br /> <br /> <br />7,769 sf <br />3,504 sf <br /> <br />11,273 sf <br /> <br />Total combined: <br /> <br />Main level <br /> <br />Existing total: <br />Adcrrtion total: <br /> <br />Total cOmbined: <br /> <br />7,952 sf <br />3,504 sf <br /> <br />11,456 sf <br /> <br />Second level <br /> <br /> <br />total: <br />total: <br /> <br />Osf <br />9,594 sf <br /> <br />Third level <br /> <br />Existing total: <br />Addition total: <br /> <br />Osf <br />9,594 sf <br /> <br />Building totals: <br /> <br />Existing: 15,721 sf <br />Addition: 16.602 sf <br />.With basement, main, and second level <br />Addition: <br />*with basement, mf.dn. second, and <br /> <br /> <br />Total (existing plus second level addition): <br />Total (existing plus max. addition): <br /> <br />33,323 sf <br />41,917 sf <br /> <br /> <br />55427 <br /> <br />www.vunmunab.com <br />