Laserfiche WebLink
STORM WATER POLLUTION PREVENTION PLAN NARRATIVE: <br />pouunaN PREVENTION <br />GENERAL INFORMATION <br />THIS STORMWATER POLLUTION PREVENTION PLAN IS PREPARED <br />TEMPORARY SEDIMENT CONTROL PRACTICES <br />FERTILIZERS ARE TO BE APPUED ONLY IN THE AMOUNTS AS SPECIFIED AND WORKED INTO <br />IN ACCORDANCE TO THE NATIONAL POLLUTANT DISCHARGE <br />DOWN GRADIENT SILT FENCE AND SEDIMENT LOG INSTALLATIONS ARE TO BE INPLACE <br />THE SOIL TO MINIMIZE EXPOSURE TO STORMWATER RUNOFF. <br />ELIMINATION SYS7EM PERMIT NO. MN RIG00D01 FOR <br />PRIOR TO THE COMMENCEMENT OF ANY EARTHWORK OPERATIONS <br />SIORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION <br />ONSTE REFUELING OPERATIONS ARE TO BE CONDUCTED WITH CARE ANY INADVERTENT <br />ACTIVITY. <br />PROJECT NAME: TALL PINES 2ND ADD. <br />TOPSOIL IS TO BE WINDROWED ALONG THE CONSTRUCTION LIMITS AND PLACED AS SLOPE <br />DRESSING IMMEDIATELY FOLLOWING COMPLETION OF THE GRADING OPERATIONS AS THE <br />SPILLAGE OF FUEL OR CHEMICALS IS TO BE IMMEDIATELY GLEANED UP, REMOVED MGM THE <br />SITE AND DISPOSED OF IN ACCORDANCE TO STATE AND LOCAL REGULATIONS MAJOR <br />LOCATION: SECTION 35 TOWNSHIP 33 RANGE 26 <br />GRADING OPERATIONS PROCEED. <br />SPILLS ARE TO BE REPORTED TO THE MPCA 24 HOUR NOTIFICATION NETWORK AT BOD 422 <br />CITY: ELK RIVER, MN <br />0798. ALL VEHICLES ON —SITE ARE TO BE MONITORED FOR LEAKS AND SUBJECT TO <br />IAT/LONG: 45.3059/-93.5501 <br />TOPSOIL PLACEMENT ALONG THE EMBANKMENT SLOPES THOUGH THE WETLANDS AREA IS <br />TO BE SPREAD BY A LOW IMPACT CRAWLER TRACTOR OPERATING UP AND DOWN THE <br />ROUTINE PREVENTIVE MAINTENANCE EFFORTS TO REDUCE THE UKEUHOOD OF LEAKAGE AND <br />OR SPILLS <br />SLOPES SO AS TO PROVIDE TRACK PRINTS PARALLEL WITH THE CONTOURS <br />DESCRIPTION OF CONSTRUCTION ACnvITY <br />INSTALLATION OF MN/DOT CATEGORY 3 EROSION CONTROL BLANKET ALONG THE <br />PORTABLE SANITARY WASTE FACILITIES ARE TO BE PROVIDED ONSITE AND EMPTIED ON A <br />BI-WEEKLY BASIS <br />TALL PINES MD ADD. CONSISTS OF GRADING, AGGREGATE <br />EMBANKMENT SLOPES ADJACENT THE WETLANDS AREA <br />BASE, BITUMINOUS PAVING, UTIUTIES, STORM WATER <br />CONCRETE BATCH TRUCKS WILL NOT BE ALLOWED TO DISCHARGE DRUM AND CHUTE <br />MANAGEMENT, AND TURF ESTABUSHMENT. <br />ALL TEMPORARY SOILS STOCKPILES WILL REWIRE AN EFFECTIVE MEANS OF SEDIMENT <br />WASHOUT DIRECTLY ON THE GROUND. A PORTABLE WASHOUT RECEPTACLE IS TO BE <br />CONTROL SUCH AS AN EROSON CONTROL BLANKET COVERING OR SILT FENCE <br />PROVIDED BY THE CONTRACTOR AT THE LOCATION AS PROVIDED BY THE OWNER. <br />PRO.sCT CONTACTS <br />INSTALLATION ALONG THE TOE of SLOPE <br />NO ENGINE DEGREASNG WILL BE ALLOWED ON SITE <br />PINES AT ELK RIVER LLC AND THE CONTRACTOR ARE <br />ALL COMPLETED SWALES SLOPES AND BOTTOMS NOT DRAINING TOWARDS WETLAND AREAS <br />RESPONSIBLE FOR IMPLEMENTATION OF THE SWPPP AND <br />THE INSTALLATION, INSPECTION, AND MAINTENANCE OF THE <br />ARE TO BE STABILIZED WITHIN 7 DAYS <br />FINAL STABILI7ATION <br />EROSION PREVENTION AND SEDIMENT CONTROL BMP'S <br />TEMPORARY STABILIZATION WILL BE REWIRED IN AREAS WHERE GRADING OPERATIONS <br />BEFORE AND DURING CONSTRUCnON. <br />ARE SUSPENDED OR CEASED FOR A PERIOD OF 7 DAYS OR GREATER. <br />FINAL STABILIZATION OCCURS WHEN 70 PERCENT OF THE PERVIOUS AREA IS COVERED WTIi <br />UNIFORM, PERMANENT VEGETATION. <br />CWPPP PRFPAREPAR <br />A ROC( CONSTRUCTION ENTRANCE FOR SEDIMENT CONTROL IS TO BE PROVIDED AT THE <br />CART, <br />SWPPP PREPARER: PEDER O N & D ASSOCIATES <br />PEDFRSON h ASSOCIATES <br />PROJECT ENTRANCE ON PARK AVENUE SOUTH. <br />ALL TEMPORARY EROSION AND SEDIMENT CONTROL FEATURES ARE TO BE REMOVED AND <br />THE NPOES NOTICE OF TERMINATION IS TO BE PREPARED AND SUBMITTED TO THE MPCA <br />TRAINING: ENGINEER AND SWPPP DESIGNER (EXP 2020) <br />STREET SWEEPING OF THE PAVED SURFACES WILL BE REWIRED AS DIRECTED BY THE <br />ADDRESS: 13076 FlRST STREET <br />BECKER. MN 53308-9372 <br />ENGINEER. <br />TELEPHONE (763) 2B2—B822 <br />TIMING OF EROSION CONTROL• <br />N OF SWPPPLAN <br />EMAIL; NANDERSONOBOGART—PEDERSON,COM <br />OWNER <br />SILT FENCE WILL BE INSTALLED PRIOR TO CONSTRUCTION. <br />OWNER CONTACT: ROGER DERRICK— PINES AT ELK RIVER LLC <br />RIPRAP AND FILTER BLANKET WILL BE PLACED AT THE OUTLETS WITHIN 24 HOURS OF <br />ADDRESS 5001 AMERICAN BV D W. SUITE 501 <br />8 OOMINGTON MN. 55437 <br />THE OUTLET PLACEMENT. <br />DESCRIPTION TITLE LOCATION <br />TELEPHONE: B12-84 <br />EJAAIL; ROGFROCHOFACHOFA MERICACOM <br />THE CONTRACTOR MUST STABILIZE ALL EXPOSED SOIL AREAS IMMEDIATELY FOLLOTWNG <br />CONSTRUCTION WHEREVER CONSTRUCTION WILL NOT OCCUR FOR A PERIOD GREATER THAN <br />Emekn Control Ceding Plw 3 <br />CONTRACTOR (TO B FlUFO IT RY TH DNTRA TORT: <br />OR EQUAL TO 7 DAYS <br />Eroslen Control Dat.R. 7 <br />DatPlls <br />BUSINESS NAME <br />STABILIZATION WORK MUST BE COMPLETE WITHIN 7 CALENDAR DAYS AFTER THE <br />OWNER NAME <br />MAILING ADDRESS <br />CONSTRUCTION WORK IN THAT AREA HAS TEMPORARILY OR PERMANENTLY CEASED. <br />CITY <br />AREAS THAT ARE WITHIN 200 FT OF A PUBLIC WATER MUST BE STASUZED WITHIN 24 <br />TELEPHONE <br />HOURS OF COMPLETING CONSTRUCTION DURING PERIODS OF 'WORK IN WATER <br />EMAIL <br />CONTACT NAME <br />RESTRICTIONS' FOR TIME PERIODS DECLARED BY THE ONR. <br />24 HOUR MPCA EMERGENCY NOTIFICATION <br />MAIUNG ADDRESS <br />CITY <br />THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN THE DISTURBED AREA UNTIL VEGETATION <br />Telephone Numbers: 651-649-5451 <br />TELEPHONE <br />N ESTABLISHED. <br />800-422-0798 <br />EMAIL <br />ONCE VEGETATION IS ESTABUSHED AND CONSTRUCTION IS COMPLETE, THE SILT FENCE <br />ESTIMATED OATES OF CONSTRUCTION: <br />AND ANY OTHER TEMPORARY EROSION CONTROL THAT IS NOT BIODEGRADABLE SHALL BE <br />REMOVED. <br />START DATE (TO BE FlLLID IN BY CONTRACTOR)EEf. <br />COMPLETION DATE _/_/_ (TO BE FILLED IN BY CONTRACTOR) <br />SNEEPINC TO BE PROVIDED AS DIRECTED BY THE ENGINEER OR OWNER. THE CITY <br />CITY. <br />NO PROJECT PHASING IS ANTICIPATED. <br />REQUIRES STREET SWEEPING TO OCCUR WITHIN 8 HOURS OF NOTICE FROM THE <br />APPLYING MULCH, HYDROMULCH, TACKIFlER, POLYACRYLAMIDE OR SIMILAR EROSON <br />PREVENTION PRACTICES IS NOT ACCEPTABLE STABILIZATION IN ANY PART OF A <br />—SEE DRAINAGE REPORT FOR MWATER CALCULATIONS <br />TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE. BLANKETS OR OTHER <br />APPROVED, BY THE ENGINEER, METHOD SHALL BE USED. <br />SITE SOIL INFORMATION IS IN DRAINAGE REPORT. <br />INSPECTION AND MAINTENANCE ACTIVITIES <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING AND SCHEDUUNG THE WORK OF ALL <br />TALL PINES SECOND ADDITION CONSISTS OF GRADING, AGGREGATE <br />OPERATIONS INCLUDING SUBCONTRACTORS AND UTIUTY COMPANIES SUCH THAT EROSION AND SEDIMENT <br />BASE, BITUMINOUS PAVING, UTIUTIES. STORM WATER MANAGEMENT, <br />AND TURF ESTABLISHMENT. <br />CONTROL MEASURES ARE FULLY EXECUTED FOR EACH OPERATION AND IN A TIMELY MANNER OVER THE <br />DURATION OF THE PROJECT. OPERATORS HAVE DAILY ACCESS TO THE PROJECT SITE THE CONTRACTOR <br />SHALL BE FULLY RESPONSBLE FOR THE SWPPP IMPLEMENTATION UNTIL THE ENTIRE SITE HAS UNDERGONE <br />CUMULATIVE IMPERVIOUS SURFACES: <br />FINAL STABILIZATION AND N.O.T HAS BEEN SUBMITTED TO THE MPCA <br />PRE —CONSTRUCTION IMPERVIOUS AREA: 0.55 ACRES <br />THE CONTRACTOR IS TO PROVIDE A TRAINED INDIMDUAL RESPONSIBLE FOR THE IMPLEMENTATION, <br />VGUACRES <br />INAND MAINTENANCE OF THE EROSION AND SEDIMENT CONTROL SAPS ON THE PROJECT. THAT <br />NEW IMPERVIOUS AREA 230 ACRES <br />INDIVIDUAL IS TO BE IDENTIFIED AT THE PRE —CONSTRUCTION CONFERENCE AND LISTED IN THE MINUTES <br />AREA TO BE DISTURBED, 6.14 ACRES <br />THEREOF. <br />THE APPOINTED INDIVIDUAL IS TO PERFORM A ROUTINE INSPECTION OF THE ENTIRE STE AT LEAST ONCE <br />RE�yyyNcW'=5: <br />STORM WATER FROM THIS SITE WILL BE COLLECTED IN A <br />EVERY SEVEN DAYS DURING CONSTRUCTION OPERATIONS AND WITHIN 24 HOURS AFTER A RAINFALL EVENT <br />GREATER THAN 0.5 INCHES IN 24 HOURS. <br />CITY OF ELK RIVER STORM SEWER SYSTEM. <br />A INSPECTION FORM AWLL BE PROVIDED BY THE CONTRACTOR. ANY DEFICIENCIES IN THE EROSION AND <br />SEDIMENT CONTROL BLIPS ARE TO BE NOTED ON THE INSPECTION FORM AND CORRECTED BY THE END OF <br />IMPAIRED WATERS WITHIN ONE MILE: <br />THE NEXT BUSINESS DAY. <br />MISSISSIPPI RIVER & TROTT BROOK <br />PERIMETER CONTROL DEVICES ARE TO BE REPAIRED ON REPLACED WHEN THEY ARE NO LONGER EFFECTIVE <br />PI ANc AND SPECIFICATIONS <br />OR WHEN THE SEDIMENT REACHES ONE—HALF THE HEIGHT OF THE DEVICE <br />THE PLAN SHEETS OF THIS PLAN SET INDICATE THE FOLLOWING ITEMS <br />TRAINNINC POWMFNTATION� <br />SWPPP IMPLEMENTATION, REVISING, AMENDING, AND INSPECTING (TO BE FILLEDIN BY THE CONTRACTOR) <br />THE PROJECT LOCATION AND CONSTRUCTION LIMITS. <br />NAME OF INDIVIDUAL <br />LOCATIONS OF IMPERVIOUS SURFACES <br />OVER <br />DATE OFNR h INSPECTING <br />DATE OF TRAINING <br />LOCATIONS ON AREAS NOT TO BE DISTURBED (E.G.. BUFFER ZONES WETLANDS <br />NAME OF CT <br />ENTITY PROVIDING TRAINING <br />ETC.). <br />CONTENT OF TRAINING <br />TOTAL HOURS OF TRAINING <br />STEEP SLOPE LOCATIONS <br />BMP INSTALLATION, MAINTENANCE, AND REPAIR (TO BE FILLED IN BY THE CONTRACTOR) <br />LOCATIONS OF ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT <br />NAME OFG&ININDIVIDUAL <br />CONTROL BMP'S TO BE INSTALLED ON THE PROJECT. <br />k INSPECTING <br />THE DETAIL SHEETS INDICATE EROSION AND SEDIMENT CONTROL BMPS TO BE <br />D TE OF <br />GATE OF TRAINING <br />NAME OF INSTRUCTOR <br />INSTALLED ON THE PROJECT. <br />ENTITY PROVIDING TRAINING <br />EXISTING AND FINAL GRADES TRIBUTARY AREA DIVIDING LINES AND DIRECTION <br />CONTENT UR TRAINING <br />TOTAL HOURS OF TRAINING <br />OF FLOW FOR ALL PRE AND, POST—AINAGE CAL STORMWATR RUNOFF <br />DRAINAGE ARE PROVIDED D THE DRAINAGE CALCULATIONS DRAINAGE <br />CALCULATIONS ARE PROVIDED UPON REQUEST BY BOGART, PEDERSON h ASSOC <br />LOfATmN <br />Z — <br />� <br />— — <br />I <br />I <br />MAN n NW <br />L�0 <br />�I <br />I <br />62ND AYE NW <br />I <br />� <br />I <br />SHERBURNE COUNTY <br />No SCALE <br />Section 35, Township 33 Range 25 <br />VICINITY MAP <br />C= 91 <br />Lu W i <br />6 < <br />o sag Roo <br />m eo go <br />O_ Z <br />O <br />Q W lJ 7 <br />Z F, it Ll C <br />O <br />J W N w d <br />W Ld p C <br />a 0 a 3 0 <br />_Jrw E> <br />Q H Z 0 4) <br />I— cD a rn a <br />.EET NO <br />4 <br />E. <br />