Laserfiche WebLink
INVOICE <br />Summary <br />2B Selective Demolition <br />2,865.00 <br />Retainage <br />2,142,954.00@ <br />5.00% <br />(143.25) <br />4A Masonry Systems <br />474,204.37 <br />Retainage <br />2,142,954.00@ <br />5.00% <br />(23,710.22) <br />513 Structural Labor <br />66,171.00 <br />Retainage <br />2,142,954.00@ <br />5.00% <br />(3,308.55) <br />6A Carpentry <br />72,613.29 <br />Retainage <br />2,142,954.00@ <br />5.00% <br />(3,630.66) <br />7A Waterproofing &WB <br />10,660.00 <br />Retainage <br />2,142,954.00@ <br />5.00% <br />(533.00) <br />713 Roofing Systems <br />26,980.00 <br />Retainage <br />2,142,954.00@ <br />5.00% <br />(1,349.00) <br />13B Ice Rink Systems <br />244,000.00 <br />Retainage <br />2,142,954.00@ <br />5.00% <br />(12,200.00) <br />21A Fire Protection <br />21,928.50 <br />Retainage <br />2,142,954.00@ <br />5.00% <br />(1,096.43) <br />22A Plumbing Systems <br />157,741.00 <br />Retainage <br />2,142,954.00@ <br />5.00% <br />(7,887.05) <br />23A HVAC <br />46,470.00 <br />Retainage <br />2,142,954.00@ <br />5.00% <br />(2,323.50) <br />26A Electrical Systems <br />421,700.00 <br />Retainage <br />2,142,954.00@ <br />5.00% <br />(21,085.00) <br />31A Multipurpose Earthwork <br />70,000.00 <br />Retainage <br />2,142,954.00@ <br />5.00% <br />(3,500.00) <br />313.3 Precast Raker/Plank/Stadia <br />411,470.00 <br />Retainage <br />2,142,954.00@ <br />5.00% <br />(20,573.50) <br />01-00 General Conditions/Requirements <br />73,411.81 <br />Retainage <br />2,142,954.00@ <br />0.00% <br />0.00 <br />90-50 General Liability Insurance <br />189.36 <br />90-80 Builders Risk Insurance <br />58.81 <br />99-99 Contractors Fee <br />43,254.61 <br />Retainage <br />2,142,954.00@ <br />5.00% <br />(2,162.73) <br />CURRENT DUE : <br />2,040,214.86 <br />