Laserfiche WebLink
enough as it will rust through time,the size of the base is proposed to be 2'x 36" <br /> and will be bolted to the ground. <br /> After discussion the committee felt that they needed more information and <br /> engineered drawings addressing their concerns before they could recommend <br /> approval to the EDA. <br /> 5. Announcements <br /> No announcements <br /> 6. Adjournment <br /> There being no further business,Dan Tveite adjourned the meeting of the Elk River <br /> Economic Development Authority at 5:30 p.m. <br /> Minutes prepared by Amanda Othoudt. <br /> Dan Tveite,EDA President <br /> Tina Allard,City Clerk <br /> 1 I r E I E I I I <br /> INATUREl <br />