My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-17-2012 ICE MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Minutes
>
2010-2019
>
2012
>
04-17-2012 ICE MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 10:53:31 AM
Creation date
3/10/2020 10:53:09 AM
Metadata
Fields
Template:
City Government
type
ICEMIN
date
4/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />HVAC, Barn Roof and Ice Plant, or if we do the full blown $8.3 million <br />expansion as proposed last year. He states that at this point, we are going to <br />need to spend $1million plus just to keep the barn afloat for 5-10 more years. <br /> <br />Chair Dale Martin notes that we cannot do nothing, we need to address the <br />HVAC, Barn Roof and fix the cracks. <br /> <br />Commissioner Gumphrey states the minimum would be to spend $36,000 to <br />fix the issues with the screws in the roof and $117,000 to refurbish our current <br />HVAC system. He also notes that we have to defend why we should NOT do <br />the minimum, as it will be a mediocre fix that will only keep the barn going <br />for 10 years before it will have to be closed down or renovated. <br /> <br />Commissioner Malzahn inquires if there are any safety concerns with the Barn <br />in it’s present condition. <br /> <br />Arena Manager Czech states, that the building is sturdy now, but the ongoing <br />issues will continue to cause problems in the future. He also notes that he will <br />call Tom Betti from the 292 group to have him crunch the numbers with the <br />new figures. <br /> <br />Parks and Recreation Director Michael Hecker suggests talking to other rinks <br />with different amenities (i.e. meeting rooms) to see what kind of revenue they <br />generate. <br /> <br />Commissioner Malzahn also suggests putting together a timeline over the next <br />20 years to show approximately how much the costs of the needed repairs will <br />increase. <br /> <br />Vice Chair Johnson inquires about Hockey Day in MN to see if Elk River has <br />been selected. <br /> <br />Activities Director Mike Cunningham notes that officially, they do not have to <br />announce the winner until the 2012 hockey day, but he is optimistic that they <br />will hear something in early May. <br /> <br />Commissioner Gumphrey suggests shooting for Early May to present the <br />options to the City Council. He also notes that he would go with Arena <br />Manager Czech to meet with Tom Betti. <br /> <br /> <br /> <br />5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.