Laserfiche WebLink
1 2 3 4 <br />I <br />6 <br />7 <br />8 <br />A <br />B <br />c <br />9 <br />E <br />F <br />OL STREET <br />2 PROPOSED CONDITIONS <br />C6.000 Tr= 80 <br />r <br />IL <br />73 <br />Ik- 'A <br />ap <br />• ;#-� <br />po r.P .- 17-f.Ir ' <br />* x r <br />w <br />` <br />r_j' <br />EXISTING CONDITIONS <br />C6,000 1 = 80 <br />1'+ <br />-4in ii� <br />u iyr,llll ' . <br />• I Ineta `ry' <br />��1 • * - `s _ !�- # � . mow. <br />WETLAND <br />N.< <br />CRA55 <br />I N.. <br />s SCH SjTx9EET \ \ <br />SPECIAL AND IMPAIRED WATERS <br />THESE SPECIAL AND IMPAIRED WATERS ARE <br />LOCATED WITHIN ONE MILE (AERIAL RADIUS) OF <br />THE PROJECT LIMITS AND RECEIVE RUNOFF FROM <br />THE PROJECT SITE. DUE TO THE PROXIMITY OF <br />THESE SPECIAL ADN IMPAIRED WATERS, THE BMPS <br />DESCRIBED IN APPENDIX A OF THE NPDES PERMIT <br />WILL APPLY TO ALL AREAS OF THE SITE. <br />WATERBODY <br />IMPAIRMENT(S) <br />FECAL CHLOROFORM; <br />MISSISSIPPI RIVER <br />FISHES BIOASSSESSMENTS; <br />MERCURY IN FISH TISSUE <br />MERCURY IN FISH TISSUE; <br />LAKE ORONO <br />NUTRIENT/EUTROPHICATION <br />BIOLOGICAL INDICATORS <br />MINIMUM ESTIMATED QUANTITIES FOR <br />EROSION CONTROL <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />DRAINAGE STRUCT. INLET FILTER <br />44 <br />EACH <br />ROCK CONSTRUCTION ENTRANCE <br />1 <br />EACH <br />CONCRETE WASHOUT <br />1 <br />EACH <br />SILT FENCE <br />2,111 <br />LF <br />NOTE: QUANTITIES SHOWN ARE THE MINIMUM <br />REQUIRED, ADDITIONAL QUANTITIES MAY BE NEEDED IF <br />REQUIRED BY THE MPCA, WATERSHED DISTRICT, OR <br />CITY. CONTRACTOR IS RESPONSIBLE FOR FINAL <br />DETERMINATION OF QUANTITIES PRIOR TO <br />CONSTRUCTION. <br />EXISTING DRAINAGE AREAS <br />DRAINAGE AREA <br />IMPERVIOUS AREA <br />(ACRES) <br />PERVIOUS AREA <br />(ACRES) <br />TOTAL AREA <br />(ACRES) <br />Q OUT (CFS) STORM EVENT <br />2-YEAR <br />(2 85") <br />10-YEAR <br />(4.24") <br />100-YEAR <br />(6.96") <br />ROUTING <br />1 <br />10.85 <br />2.65 <br />13.50 <br />46.32 <br />71.48 <br />115.80 <br />SHEET FLOW SOUTH <br />TOTAL <br />10.85 <br />2.65 <br />13.50 <br />46.32 <br />71.48 <br />115.80 <br />PROPOSED <br />DRAINAGE AREAS <br />DRAINAGE AREA <br />IMPERVIOUS AREA <br />(ACRES) <br />PERVIOUS AREA <br />(ACRES) <br />TOTAL AREA <br />(ACRES) <br />Q OUT (CFS) STORM EVENT <br />2-YEAR <br />(2 85") <br />10-YEAR <br />(4.24") <br />100-YEAR <br />(6.96") <br />ROUTING <br />1 <br />11.72 <br />1.77 <br />13.49 <br />49.89 <br />75.84 <br />120.30 <br />SHEET FLOW SOUTH <br />TOTAL <br />11.72 <br />1.77 <br />13.49 <br />49.89 <br />75.84 <br />120.30 <br />STORMWATER RUNOFF SUMMARY <br />2-YR STORM (2.85") <br />RUNOFF (CFS) <br />10-YR STORM (4.24") <br />RUNOFF (CFS) <br />100-YR STORM (6.96") <br />RUNOFF (CFS) <br />EXISTING SITE <br />46.32 <br />71.48 <br />115.80 <br />PROPOSED SITE <br />49.89 <br />75.84 <br />120.30 <br />HANDLING AND STORAGE OF HAZARDOUS <br />MATERIALS: <br />IF THE CONTRACTOR INTENDS TO USE POLYMERS, <br />FLOCCULANTS, OR OTHER SEDIMENTATION <br />TREATMENT CHEMICALS ON THE PROJECT SITE, THE <br />CONTRACTOR MUST COMPLY WITH THE FOLLOWING <br />MINIMUM REQUIREMENTS: <br />1. THE CONTRACTOR MUST USE CONVENTIONAL <br />EROSION AND SEDIMENT CONTROLS PRIOR TO <br />CHEMICAL ADDITION TO ENSURE EFFECTIVE <br />TREATMENT. CHEMICALS MAY ONLY BE APPLIED <br />WHERE TREATED STORMWATER IS DIRECTED TO <br />A SEDIMENT CONTROL SYSTEM WHICH ALLOWS <br />FOR FILTRATION OR SETTLEMENT OF THE FLOC <br />PRIOR TO DISCHARGE. <br />2. CHEMICALS MUST BE SELECTED THAT ARE <br />APPROPRIATELY SUITED TO THE TYPES OF <br />SOILS LIKELY TO BE EXPOSED DURING <br />CONSTRUCTION, AND TO THE EXPECTED <br />TURBIDITY, PH AND FLOW RATE OF <br />STORMWATER FLOWING INTO THE CHEMICAL <br />TREATMENT SYSTEM OR AREA. <br />3. CHEMICALS MUST BE USED IN ACCORDANCE <br />WITH ACCEPTED ENGINEERING PRACTICES, AND <br />WITH DOSING SPECIFICATIONS AND SEDIMENT <br />REMOVAL DESIGN SPECIFICATIONS PROVIDED BY <br />THE MANUFACTURER OR PROVIDER/SUPPLIER <br />OF THE APPLICABLE CHEMICALS. <br />ON -SITE FUEL TANKS REQUIRE SECONDARY <br />CONTAINMENT AS REQUIRED BY THE PERMIT. <br />PORTABLE FUEL TRUCKS SHALL HAVE THEIR SPILL <br />KITS AVAILABLE DURING FUELING. SPILLS GREATER <br />THAN 5 GALLONS MUST BE REPORTED TO THE <br />PROPER AUTHORITIES. <br />GRADING & SOILS <br />BASED ON SOIL BORING(S) PROVIDED BY AMERICAN <br />ENGINEERING AND TESTING SOILS TYPICALLY FOUND <br />ON THIS PROJECT ARE: SP-SM, FILL. <br />REFER TO THE GEOTECHNICAL REPORT FOR <br />ADDITIONAL INFORMATION. <br />PROJECT NARRATIVE <br />THE PROJECT SITE IS A PORTION OF THE ELK RIVER HIGH SCHOOL AND VANDENBERGE MIDDLE SCHOOL. <br />CURRENTLY RUNOFF SHEET FLOWS SOUTH ACROSS THE SITE TO STORM SEWER IN SCHOOL STREET. ULTIMATELY <br />STORMWATER RUNOFF GOES TO THE LIONS PARK STORMWATER POND. <br />THE PROPOSED PROJECT CALLS FOR THE REMOVAL OF THE PAVEMENT AT ELK RIVER HIGH SCHOOL AND <br />VANDENBERGE MIDDLE SCHOOL. ALSO THE VANDENBERGE MIDDLE SCHOOL STORMWATER POND WILL BE <br />REMOVED. RUNOFF WILL CONTINUE TO SHEET FLOW SOUTH ACROSS THE SITE TO STORM SEWER IN SCHOOL <br />STREET. ULTIMATELY STORMWATER RUNOFF FLOWS TO THE LIONS PARK STORMWATER POND FOR TREATMENT AND <br />RATE CONTROL. <br />CONSTRUCTION ACTIVITY EROSION <br />PREVENTION PRACTICES <br />CONTRACTOR SHALL STABILIZE ALL EXPOSED SOIL <br />AREAS (INCLUDING STOCKPILES). STABILIZATION <br />MUST BE INITIATED IMMEDIATELY TO LIMIT SOIL <br />EROSION WHENEVER ANY CONSTRUCTION ACTIVITY <br />HAS PERMANENTLY OR TEMPORARILY CEASED ON <br />ANY PORTION OF THE SITE AND WILL NOT RESUME <br />FOR A PERIOD EXCEEDING 7 CALENDAR DAYS. <br />STABILIZATION MUST BE COMPLETED NO LATER <br />THAN 7 CALENDAR DAYS AFTER THE CONSTRUCTION <br />ACTIVITY IN THAT PORTION OF THE SITE HAS <br />TEMPORARILY OR PERMANENTLY CEASED. <br />FOR PUBLIC WATER THAT THE DNR HAS <br />PROMULGATED "WORK IN WATER RESTRICTIONS" <br />DURING SPECIFIED FISH SPAWNING TIME FRAMES, <br />ALL EXPOSED SOIL AREAS THAT ARE WITHIN 200 <br />FEET OF THE WATER'S EDGE, AND DRAIN TO THESE <br />WATERS MUST COMPLETE THE STABILIZATION <br />ACTIVES WITHIN 24 HOURS DURING THE <br />RESTRICTION PERIOD. <br />PIPE OUTLETS MUST BE PROVIDED WITH <br />TEMPORARY OR PERMANENT ENERGY DISSIPATION <br />WITHIN 24-HOURS AFTER CONNECTION TO A <br />SURFACE WATER. <br />SEDIMENT CONTROL MEASURES MUST BE INSTALLED <br />ON ALL DOWN GRADIENT PERIMETERS BEFORE ANY <br />UPGRADIENT LAND DISTURBING ACTIVITIES BEGIN. <br />SEDIMENT AND EROSION CONTROL <br />MAINTENANCE <br />PERIMETER SEDIMENT CONTROL PRACTICES: WHEN <br />SEDIMENT REACHES 1/3 THE HEIGHT OF THE BMP, <br />THE SEDIMENT MUST BE REMOVED WITHIN 24 <br />HOURS. IF PERIMETER SEDIMENT CONTROL HAS <br />BEEN DAMAGED OR IS NOT FUNCTIONING <br />PROPERLY, IT MUST BE REPAIRED AND/OR <br />REPLACED WITHIN 24 HOURS. PERIMETER BMP <br />MEASURES MAY INCLUDE SILT FENCING. <br />CONSTRUCTION SITE VEHICLE EXIT LOCATIONS: ALL <br />TRACKED SEDIMENT ONTO PAVED SURFACES MUST <br />BE REMOVED WITHIN 24 HOURS OF DISCOVERY OR <br />MORE FREQUENTLY IF REQUIRED BY CITY OR <br />WATERSHED. <br />CONSTRUCTION SITE DEWATERING: <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />OBTAINING ALL DEWATERING PERMITS. DISCHARGE <br />FROM ALL DEWATERING OPERATIONS SHALL BE <br />DIRECTED TO ON -SITE DEPRESSIONS. NO <br />DISCHARGE FROM DEWATERING OPERATIONS SHALL <br />BE DIRECTED OFF -SITE TOWARDS A WATER OF THE <br />STATE. <br />PORTABLE TOILET NOTES: <br />1. PORTABLE TOILETS POSE AN ENVIRONMENTAL <br />HAZARD WHEN PLACED IN THE VICINITY OF <br />STORM DRAINS OR BODIES OF WATER. <br />PORTABLE TOILET CLEANING ACTIVITIES CAN <br />ALSO GENERATE POLLUTANTS THAT CAN <br />DEGRADE WATER QUALITY. <br />2. PORTABLE TOILET PLACEMENT: <br />2.1. PLACE PORTABLE TOILETS ON FLAT STABLE <br />GROUND WITH CLEAR ACCESS TO THE <br />UNITS. <br />2.2. LOCATE TOILETS A MINIMUM OF 20 FEET <br />FROM ANY WATER BODY AND 10 FEET <br />FROM ANY CURB AND GUTTER. IF <br />UNFEASIBLE, AN EARTHERN BERM OR SAND <br />BAG BERM SHALL BE PLACED AROUND THE <br />UNIT FOR SPILL AND LEAK CONTAINMENT. <br />2.3. AVOID PLACING TOILETS ON IMPERVIOUS <br />SURFACES THAT WILL QUICKLY DRAIN TO <br />STORM SEWERS. <br />2.4. LOCATE TOILETS SO THAT EXPOSURE TO <br />TRAFFIC AND MOVING EQUIPMENT IS <br />MINIMIZED. <br />2.5. SECURE TOILETS TO THE GROUND WITH <br />STAKES OR CABLES. <br />2.6. RINSE WATER FROM CLEANING ACTIVITIES <br />SHALL NOT BE DISPOSED ON SITE. <br />3. REGULARLY CHECK TOILETS FOR DAMAGE, <br />LEAKS AND SPILLS AS PART OF THE WEEKLY <br />STORMWATER SITE INSPECTION. <br />4. OWNER IDENTIFICATION AND CONTACT <br />INFORMATION SHALL BE DISPLAYED IN A <br />PROMINENT LOCATION ON EACH UNIT. <br />1►1 <br />60' 30' 0 60' 120' <br />SCALE 1W = 60' <br />MECHANICAL AND NON STORMWATER <br />DISCHARGES, EXISTING AND PROPOSED <br />1. WATER LINE FLUSHING <br />2. LANDSCAPE IRRIGATION <br />3. DISCHARGE FROM POTABLE WATER SOURCES <br />AGENCY CONTACTS <br />CITY OF ELK RIVER <br />ENGINEERING DEPARTMENT <br />PHONE: (763) 635-1000 <br />MINNESOTA POLLUTION CONTROL AGENCY <br />PHONE: (651) 296-6300 <br />INDEPENDENT SCHOOL DISTRICT 728 <br />11500 193RD AVENUE NW <br />ELK RIVER, MN 55330 <br />PHONE: (763) 241 -3400 <br />NOTE: <br />THE CONTRACTOR MUST COMPLETE, SIGN, OBTAIN <br />OWNERS SIGNATURE, PAY FEE, AND SEND IN THE <br />NPDES PERMIT APPLICATION. CONTRACTOR SHALL <br />PROVIDE A CERTIFIED EROSION CONTROL <br />SUPERVISOR. SWPPP DOCUMENTATION, INCLUDING <br />INSPECTION REPORTS SHALL BE RETAINED FOR A <br />PERIOD OF THREE (3) YEARS. DESIGN <br />CALCULATIONS ARE ON FILE AT BKBM. <br />THE OWNER AND CONTRACTOR ARE RESPONSIBLE <br />FOR IMPLEMENTATION OF THE SWPPP AND <br />INSTALLATION, INSPECTION, AND MAINTENANCE OF <br />THE EROSION PREVENTION AND SEDIMENT CONTROL <br />BMPS, BEFORE, DURING, AND AFTER CONSTRUCTION <br />UNTIL THE NOTICE OF TERMINATION HAS BEEN <br />FILED. <br />STOCKPILES: <br />ON -SITE STOCKPILES OF SOIL SHALL HAVE <br />PERIMETER SEDIMENT CONTROL. STOCKPILES SHALL <br />BE STABILIZED WITH BLANKETS, TARPS, OR HYDRO <br />MULCH IF LEFT ON -SITE FOR MORE THAN 7 DAYS. <br />TEMPORARY SEDIMENT BASINS: <br />TEMPORARY SEDIMENT BASINS SHALL BE PROVIDED <br />PER APPENDIX A, SECTION C.1.13 OF THE MPCA <br />GENERAL STORMWATER PERMIT. <br />ENGINEER ANTICIPATES THAT, PRIOR TO <br />INSTALLATION OF FILTRATION MEDIA AND DRAIN TILE, <br />CONTRACTOR WILL USE PROPOSED FILTRATION <br />BASINS AS TEMPORARY SEDIMENT BASINS. <br />CONTRACTOR SHALL EXCAVATE TEMPORARY BASINS <br />AND CLAY LINE PRIOR TO USE. SURFACE WATER <br />SHALL BE REMOVED BY SKIMMER DEVICE SUCH AS <br />FAIRCLOTH SKIMMER OR THIRSTY DUCK, OR USING <br />A PUMP WITH A FILTER. ALTERNATIVE TEMPORARY <br />SEDIMENT BASINS SHALL BE APPROVED BY <br />ENGINEER PRIOR TO USE. <br />IN LIEU OF USING TEMPORARY SEDIMENT BASINS, <br />THE CONTRACTOR MAY PHASE THEIR CONSTRUCTION <br />SO THAT NOT MORE THAN 5 ACRES OF AREA IS <br />DISTURBED AT ONE TIME. FULL STABILIZATION OF <br />THE DISTURBED AREA IS REQUIRED PRIOR TO <br />DISTURBING ADDITIONAL AREAS. <br />SWPPP IMPLEMENTATION, INSTALLATION, <br />INSPECTION, AND BMP MAINTENANCE BY <br />NPDES PERMITING CONTRACTOR. <br />NAM E: <br />CERTIFICATION #:_____________ <br />DATE: <br />OTHER NOTES: <br />1. THIS SWPPP WAS PREPARED BY PERSONNEL <br />THAT ARE CERTIFIED IN THE DESIGN OF <br />CONSTRUCTION SWPPPS. COPIES OF THE <br />CERTIFICATIONS ARE ON FILE WITH BKBM AND <br />ARE AVAILABLE UPON REQUEST. <br />2. THIS SWPPP DOCUMENT MUST BE AMENDED <br />AS NECESSARY DURING CONSTRUCTION IN <br />ORDER TO KEEP IT CURRENT WITH THE <br />POLLUTANT CONTROL MEASURES UTILIZED AS <br />THE SITE. THE SITE MAP SHOWING LOCATIONS <br />OF ALL STORM WATER CONTROLS MUST BE <br />POSTED ON THE SITE AND UPDATED TO <br />REFLECT THE PROGRESS OF CONSTRUCTION. <br />N OTE: <br />THE STORM WATER POLLUTION PREVENTION PLAN <br />FOR THIS PROJECT INCLUDES THE CIVIL <br />ENGINEERING PLANS AND THE PROJECT MANUAL. <br />CONTRACTOR TO SUPPLY CONSTRUCTION PHASING <br />NARRATIVE, ESTIMATED PRELIMINARY QUANTITIES OF <br />ALL EROSION PREVENTION AND SEDIMENT CONTROL <br />BMP'S ANTICIPATED AT THE START OF THE <br />PROJECT AND FOR THE LIFE OF THE PROJECT, <br />AND LOCATION OF AREAS WHERE CONSTRUCTION <br />WILL BE PHASED TO MINIMIZE DURATION OF <br />EXPOSED SOIL AREAS. CONTRACTOR IS TO REVIEW <br />MINNESOTA POLLUTION CONTROL AGENCY'S <br />INSTRUCTIONS FOR THE APPLICATION FOR <br />MINNESOTA'S NPDES/SDS GENERAL STORMWATER <br />PERMIT FOR CONSTRUCTION ACTIVITY PRIOR TO <br />SUBMITTING APPLICATION. <br />INSPECTIONS <br />EXPOSED SOIL AREAS: ONCE EVERY 7 DAYS AND <br />WITHIN 24 HOURS FOLLOWING A 1/2 INCH OVER <br />24 HOURS RAIN EVENT. <br />STABILIZED AREAS: ONCE EVERY 30 DAYS. <br />FROZEN GROUND: AS SOON AS RUNOFF OCCURS <br />OR PRIOR TO RESUMING CONSTRUCTION. <br />RECORDS: A COPY OF THE GRADING, DRAINAGE <br />EROSION CONTROL PLAN AND WATERSHED DATA & <br />SWPPP PLANS AS WELL AS THE <br />INSPECTIONS/MAINTENANCE LOGS ARE TO BE KEPT <br />EITHER IN THE FIELD OFFICE, INSPECTOR'S VEHICLE <br />OR CONTRACTOR'S VEHICLE. <br />2020 Elk River <br />High School <br />Parking Lot <br />Improvements <br />900 School St NW <br />Elk River, MN 55330 <br />Independent School <br />District #728 <br />11500 193rd Ave. NW <br />Elk River, MN 55330 <br />WOLD ARCHITECTS <br />AND ENGINEERS <br />332 Minnesota Street, Suite W2000 <br />Saint Paul, MN 55101 <br />woldae.com 1 651 227 7773 <br />BKBM' <br />ENGINEERS <br />6120 Earle Brown Drive, Suite 700 <br />Minneapolis, MN 55430 <br />Phone: (763) 843-0420 <br />Fax: (763) 843-0421 <br />www.bkbm.com <br />CONSTRUCTION <br />DOCUMENTS <br />O2020 BKBM Professional Engineers, Inc. <br />All rights reserved. <br />This document is an instrument of service and is the property of BKBM <br />Professional Engineers, Inc. and may not be used or copied without <br />prior written consent. <br />BKBM JOB NUMBER: 17445.01 <br />I hereby certify that this plan, specification or report was <br />prepared by me or under my direct supervision and that I am <br />a duly Licensed Professional Engineer under the laws of the <br />State of Minnesota. <br />Kevin A. Bohl <br />License Number: 52209 Date 01/03/2020 <br />Revisions <br />Date <br />Comm: 182030 <br />Date: 01 /03/2020 <br />Drawn: WH (I <br />Check: KAB North <br />STORM WATER <br />POLLUTION <br />PREVENTION PLAN <br />6mOOO <br />VICINITY MAP <br />