My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.1. PCSR 03-02-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2020
>
03-02-2020 SPECIAL
>
3.1. PCSR 03-02-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 9:54:53 AM
Creation date
2/27/2020 12:41:49 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTIONDOCUMENTSwww.bkbm.com6120 Earle Brown Drive, Suite 70Minneapolis, MN 55430Phone: (763) 843-0420Fax: (763) 843-0421BKBMENGINEERSFEDCBA12345678NorthCheck:Drawn:Date:Comm:License Number:DateI hereby certify that this plan, specification or report wasprepared by me or under my direct supervision and that I ama duly Licensed Professional Engineer under the laws of theState of Minnesota.2020 BKBM Professional Engineers, Inc.All rights reserved.This document is an instrument of service and is the property of BKBMProfessional Engineers, Inc. and may not be used or copied withoutprior written consent.BKBM JOB NUMBER: 17445.01CIndependent SchoolDistrict #7282020 Elk RiverHigh SchoolParking LotImprovements11500 193rd Ave. NWElk River, MN 55330KABWH01/03/202018203001/03/202052209RevisionsDescriptionDateNumKevin A. Bohl900 School St NWElk River, MN 55330C1.001DEMOLITIONPHASING PLAN
The URL can be used to link to this page
Your browser does not support the video tag.