My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4. PCSR 02-25-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2020
>
02-25-2020
>
5.4. PCSR 02-25-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 1:53:55 PM
Creation date
2/21/2020 12:56:34 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
2/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Nntas- <br />01. Refer to Sheet 1.11.003 for Planting Details and Schedules. <br />02. Sea Civil Engineers plans far site plan layout and dimensions. <br />03. Contractor coordinate all work In me city dgh W -way wNh Sherburne <br />County & City of Elk Rive Punk works Departments. <br />04. Protect Inds" hese to remain from damage during construction. <br />05. Place topsoil Or slope dresaing on all areas disturbed by <br />construction. Including rightof�sy boulevards, unless spedAed <br />otherwise. Sea spec0 cefico . <br />OS. Refer to Specifications for additional Information. <br />07. Ensure new Sod is placed to match tletcFlayer alevation of hdfacarl, <br />ex)Stirhg hof to remain. AN fine grading of sot areas shall be the <br />responsibility of the sod sub-mnhectDr(s), Including sub -curt <br />work Field verify disturbance upon mobliimtkn - actual sod <br />areas may dOfNfrom anticipated limb shown on plan. <br />08. Irrigation: The landscape contractor is required to protect the existing <br />hdgatlon system outside the work Omits during construction. WdNn the <br />work limits, cap Ulnas and remove & selvage irrigation components for <br />reuse. Submit irrlglDon plan showing the new heeds & pipe connecting <br />to the existing System. <br />IrTi ation Notes & Requirements: <br />1. LAYOUTWORKAB ACCURATELY AS POSSK"TO T14E CONTRACTOR PROVIDED AND OWNER -APPROVED MUGATIDN LAYOUT <br />PLANS. =THE MAY MARE MINOR ADJUSTMENTS TO THE LOCATION AND SPACING AS NECESSARY TO <br />ACCOMMODATE ACTUAL FELD CONDITIONS. HEAD LOCATIONS SHALL BE FLAGGED AND <br />REVIEWED BY THE OWNER'S RTF. PRIOR TO IMALLATON <br />R COORDINATE BLEEWM AND IRRIGATION PIPE I HEAD INTERNAL PLUNKING RETALIATION WITH THE WORK OF OTHERS. <br />& ALL MATERIALS SHALL BE INSTALLED AS DETAILED ON DRAWNGS.(HOWEVER, F THE CONTRACT DRAWINGS ARGON <br />SPECFICATIONSDO NUTTHORGUGNLY DESCRIBE THE METHOD OR TECHNIQUES TO BE USED, THE CONTRACTORSHILLL <br />FOLLOW THE NSTALLATNN METHODS BRED BY T14E MAMJFACT RF ALL SUCH LITERATURE FUST BE SIIBYTTED 2WEERS <br />PRIOR TO INSTALLATION FOR REVIW ANDAPPROVAL BYnE LANDSOAPEARCIHTECL) <br />4. CNECKANDYERFYALL EWM AND PROPOSED SITE CONDITIONS. UTBDTESAND SERVNMPMORTOTAENCMIG. <br />L LATERAL PIPING TO BEA MINIMUM OF 12 INCHES DEEP AND MAINLINES A MINIUM OF 18 INCHES DEEP. <br />6. ALLMAN LEE PIPING AND LATERAL PPE OF I -TT AND LARGER SHALL BE PVC(SDR 28/CLASS 160). ALL07HERLATeML <br />PPE OF 14M• AND SMALLER MAYBE POLYETHYLENE, UNLESS OTHERWISE NOTED ON THE MANS. BUBOM CONNECTIONS <br />ARE TO BE COPPER <br />7. ALL TEES AND EJ30M ON MAN L.NES SHALL BE PVC (160 PSB. <br />8. IRRIGATION EOLIIPMENT SHALL HUNTER FR041PRAy mEADs. Inlay VALVES, AND POP ROTORS. DO NOT INSTALL P OR 1r ROUND <br />VALVE BOIIEL <br />0. ADJUST HEADS FOR GRADE AS NECESSARY. AFTER TNFORASS HAS SEEN ESTABLISHED AND ALL SE77lEAENTATHEADS <br />HAS OCCURRED. <br />10. FIELD YERFY ownw CONTROLLER, BACKFLOW DEVICE. AND VALVES FOR PROPER FUNCTION. VERIFY RAN season AND IF <br />ONE DOES HOT OW, NCLIIDE NEW UNDER BABE M. THE MAN ASSUMES THE DUSTING IRRIGATION SYSTEM 19 FUNCTIONAL <br />III. USE TERM TAPE ON ALL THREJIOED JONTIL <br />12 CONDUCT PERFORMANCE TEAT N THE PRESENCE OF OWNER AND LANDSCAPE ARMTECr FOLLOWING COMPLETION OF <br />SYSTEM I&MALLATON. <br />13. CONDUCT AND DEMONSTRATE WINTERIZATION AND SPRING STANT4P PROCESS TO OWNER N THE FALL OF COMPLETION. <br />14. LANDSCAPE ARCHITECT SHALL BE NOTIFIED TOVERIFY TRENCH DEPTHS BEFORE BACKFILLING. <br />1L OVEN -SPRAY OF THE IRRIGATION SYSTEM ONTO ADJACENTWADE AND ASPHALT FAVORS IS NOTACCEPTAHLE. <br />16. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBWrMOACOWLEIE MgATNNLAYOUTPLAN SETAND <br />SUBMITTING TO THE LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO COMMENCEMENT OF FELD NSTALLATIDN. <br />17. COORDINATE LOCATION OF ROOFTOP -MOUNTED ATMOSPHERIC MOISTURE (RAN) SENSOR WITH OWNER AMD ARCHITECT. <br />INCLUDE A NEW RAN SENSOR WITH THE NEW &TOTS CONTROLLER. <br />1L SUBMIT LAYOUT PLAN AND PRODUCT DATA TO THE OWNER FOR REVIEW AND APPROVAL PRIOR TO RMALLATION. <br />IL EMOATTON BE SHALL INCLUDE III FALL SHUTAOWDN AND(1) SPRING STARTOP. <br />28. THM PROJECT WILL USE HUNTER IRRIGATION PRODUCTS PER DISTRICT STANDARD. <br />21. PROVIDETHEONNELw1IH AN A54MT PLAN, INCLUDING THE EUSTNG SYSTEM AS WELL AS NEWLY INSTALLED MATERIALS. <br />22. IRRIGATION CONTRACTOR TO CONDUCTFELD VERIFICATION OF THE EXWM SYSTEM MDR TO SIDDN6 OBTAINWORKING <br />PRESSUREMND SSS OF PIPES TWAT WN. BE MODIFIED. R S ANIMATED THATMODFYNG THE EVOING SYSTEM E WTSIN <br />ITB CEMENT CAPACITY. <br />21. IRRIGATION CONTRACTOR (F DIFFERENT THAN THE LANDSCAPE CONTRACTOR) E REQUIRED TO PROTECTTHE OWING <br />MIGATE 6Y8TEM OUTSIDE THE WORN LINTS DURING CONSTRUCTION. WTTHN THE WORK LNTS, CAP LINES AND MARK <br />LOCATIONS N THE FIELD. SUBMIT IRRIGATION LAYOUT PLAN SHOWING THE NEW HEADS AND PPE CONNECTING TO THE <br />EKMTNO BYSIEL <br />21. MUTTON CONTRACTOR TO REMOVE THE EXISTING CONTROLLERS& RAN SENSORS AND REPLACE WITH A NEW HUNTER <br />&CORE CONTROLLER AND RAN BMW PER DISTRICT STANDAGD. PROVIDE A PRINTED 8MII MAP OF ALL ZONES AFTER NEW <br />CONTROLLER S WIRED AND TESTED. <br />� (ighMIMSIRGA} <br />SaanE�exo�e srerOaesr <br />nhWL4RAFE <br />'�wharerwxeAsoshew <br />HSNexerhemsnws�oxrr <br />�j Ix <br />i +1TYPICAL SPRINKLER HEAD DETAIL <br />IRRIGATION PERFORMANCE PLAN <br />2020 Elk River <br />High School <br />Parking Lot <br />Improvements <br />900 School Street NW <br />Elk River, MN 5533D <br />Independent School <br />District #728 <br />11500 93rd Ave. N. <br />Elk River, MN 55330 <br />n <br />WOLD ARCHRECTS <br />AND ENGINEERS <br />DDaDams,.,. sm.wmoo <br />sw2Aa.Goa ssmr <br />B!\S..IIYI <br />ENGINEERS <br />6120 Earle &wm Dr., Suta 700 <br />MIT—koolis, MN 55430 <br />Pho Io:(763) 5434420 <br />Fax: (763) 8930421 <br />www.bkbm.com <br />CONSTRUCTION <br />DOCUMENTS <br />m~rim ��wMM��rri r�n�ah �4 <br />h.nxw� umnreen er arvaEmra <br />cox.rr ,� <br />oee: ouwams <br />ai.dc ea Non <br />IRRIGATION <br />PERFORMANCE <br />PLAN <br />L1.002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.