Laserfiche WebLink
<br />e EXHIBIT B <br /> 1. TERRY MAURER'S MEMO DATED JUNE 15, 1994, BE INCORPORATED INTO THE <br /> REVISED PRELIMINARY PLAT AND DEVELOPMENT PLANS. <br /> 2. THE PRELIMINARY PLAT WILL BE ALLOWED TO HAVE ONE ACCESS POINT <br /> ONTO COUNTY ROAD NO. 30 AND THAT ACCESS POINT ALIGN WITH <br /> MACON STREET SOUTH OF COUNTY ROAD NO. 30. <br /> 3. THE DEVELOPER SUBMIT A PLAN TO THE CITY IDENTIFYING THE LOCATION OF <br /> ALL MAIL BOXES AND DETAIL ILLUSTRATING THE UNIFORM MAIL BOX DESIGN <br /> THAT WILL BE USED THROUGHOUT THE PLAT. <br /> 4. THE DEVELOPER PROVIDE A LANDSCAPE PLAN TO THE CITY FOR APPROVAL <br /> ILLUSTRATING BERMING AND LANDSCAPING ALONG COUNTY ROAD NO. 30 <br /> AND JOPLIN STREET. SAID PLAN SHOULD CONSIST OF A COMBINATION OF <br /> CONIFERS AND SHRUBS WHICH WILL HELP BUFFER AND PROVIDE AN <br /> AESTHETIC STREET SCAPE. <br /> 5. FINAL PLAT INCLUDE A RESTRICTED ACCESS ALONG COUNTY ROAD NO. 30. <br /> 6. THE EXISTING HOMESTEAD AND ALL ASSOCIATED OUT BUILDINGS BE <br /> REMOVED FROM THE PROPERTY PRIOR TO RECORDING THE FINAL PLAT. <br /> 7. DEVELOPER GRANT THE NECESSARY DRAINAGE AND UTILITY EASEMENTS TO <br />e FACILITATE THE EXTENSION OF PUBLIC UTILITIES TO SERVE THIS PROPERTY AND <br /> THE WESTERN AREA. <br /> 8. A GRADING PLAN BE REVIEWED AND APPROVED BY THE CITY ENGINEER <br /> PRIOR TO COMMENCING GRADING ON SITE. <br /> 9. A DEVELOPMENT PLAN BE SUBMITTED ILLUSTRATING TYPES OF HOMES AND <br /> LOWEST FLOOR ELEVATIONS AND BE APPROVED BY THE CITY ENGINEER <br /> PRIOR TO ISSUING BUILDING PERMITS. <br /> 10. NECESSARY TRAIL CORRIDORS BE PROVIDED WITHIN THE PLAT AS APPROVED <br /> BY THE CITY COUNCIL. <br /> 11. A DEVELOPERS AGREEMENT BE PREPARED AND EXECUTED PRIOR TO <br /> RELEASING THE FINAL PLAT FOR RECORDING. <br /> 12. ONE 2" CALIPER OVERSTORY TREE BE PROVIDED EVERY SIXTY (60) LINEAL FEET <br /> THROUGHOUT THE PROPOSED SUBDIVISION. THESE TREES SHOULD BE <br /> IDENTIFIED ON THE PROPOSED LANDSCAPE PLAN SUBMITTED PRIOR TO <br /> RELEASING THE FINAL PLAT FOR RECORDING. <br /> 13. A STORM WATER IMPACT FEE OF S100 PER LOT BE PAID PRIOR TO RELEASING <br /> THE FINAL PLAT FOR RECORDING. <br /> 14. PAYMENT FOR SEAL COATING THE STREETS IN THE AMOUNT AS DETERMINED <br />e BY THE CITY ENGINEER BE PAID PRIOR TO RECORDING THE PLAT. <br /> <br />Page 6 <br />