My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 02-03-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
02-03-2020
>
7.1. SR 02-03-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 10:06:51 AM
Creation date
1/30/2020 3:12:15 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/3/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Staff approval of a site plan showing the presence of an approved surface (bituminous, class 5, or <br />concrete) on all driving and parking areas. <br />2. All fencing shall be green in color in order to reduce visual impacts around the property. <br />3. Follow the 2015 Minnesota State Fire Code Appendix D for Fire Apparatus Access Roads. <br />4. Follow all city stormwater management practices and procedures established as part of phase 1 of the <br />Copart project. <br />5. Amend the current NPDES permit to include both phases. <br />6. Staff approval of a vehicle staging plan. Parking, stalling and staging will not be permitted on Jarvis St., <br />163rd Ave., or 165d' Ave. or any other rights -of -way. <br />7. City ordinance requires one tree per 40 linear feet of perimeter, plus three more. This results in a <br />requirement for 134 trees (50% deciduous, 25% evergreen, and 25% ornamental). Credits will be given <br />for any trees that will remain on the property after construction. Submit a landscape plan demonstrating <br />compliance with the ordinance. <br />Background/Discussion <br />Case Nos. EV 19-06, P 19-13, and CU 19-17 <br />The applicant, Copart of Connecticut, Inc., proposes establishment of a salvage yard on three oudots (PID's <br />75-712-0010, 75-712- 0030, & 75-712-0040). The properties are zoned I-3 (General Industrial) where salvage <br />yards require a Conditional Use Permit (CUP). This will be the second phase of Copart's business plans in the <br />City of Elk River and would expand their total footprint to approximately 45 acres. <br />At full build -out and operational capacity, the Copart operation will include a new 12,800 SF office and shop <br />facility and 14 full-time employees. The hours of operation will remain Monday through Friday, 8:00 a.m. to <br />5:00 p.m., and will be closed on weekends. <br />The additional parcels total 28 acres and are currently vacant/undeveloped oudots. The application package <br />includes a request to vacate the undeveloped right-of-way through the property, and a final plat combining <br />the existing oudots into one buildable lot and re-establishing necessary rights -of -way. <br />Staff has concerns regarding the storage of damaged motor vehicles, and the hazardous materials that <br />accompany them. However, due to the type of business Copart is classified as, state and county regulations <br />for salvage yards do not apply. Staff addressed this with the last project by requiring additional pollution <br />control measures through the CUP process, and those same standards are again required for this phase. <br />Traffic Analysis <br />The applicant completed two separate traffic impact studies to address concerns their proposed use may <br />generate significant negative traffic impacts to the surrounding intersections — specifically Jarvis/Highway 10. <br />The study shows that without the Copart project, the level of service (length of wait at an intersection) for <br />vehicles taking left turns from Jarvis to eastbound 10 and vehicles crossing highway 10 from Jarvis to <br />Cleveland will continue become worse, possibly reaching a 50-second delay during the peak afternoon traffic <br />times. <br />With construction of the Copart project the level of service for the same movements worsens to which <br />drivers would wait longer than one minute. The study also shows that two of the nine warrants for <br />installation of a traffic signal are met under the build scenario. <br />N:\Public Bodies\Agenda Packets\02-03-2020\7.1 sr Copart 2.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.