Laserfiche WebLink
LOCATION, INSTALLATION AND FUTURE MAINTENANCE <br /> We are suggesting a location in the downtown area. The final site will be determined <br /> collaboratively based upon the final design parameters and best artistic impact for the <br /> community. <br /> Timeline <br /> These are possible dates and can be adjusted to meet specific construction dates. <br /> Project approval 06/10/2020 <br /> Final design approved 06/24/2020 <br /> Order and procure materials, begin 07/15/2020 <br /> fabrication <br /> Project update 08/06/2020 <br /> Project update 08/31/2020 <br /> Install 09/24/2020 <br /> Maintenance <br /> Our approach engenders a low maintenance sculpture to provide long-lasting joy. We will <br /> provide a suggested maintenance plan to keep the piece enjoyable and safe to the community. <br /> Craig Snyder/Homan Wong Elk RiverProposal <br />