Laserfiche WebLink
E. Location, Installation and Future Maintenance <br /> This area is subject to change and would look to working with the city and the people <br /> involved in the project that all dates are created and met. If possible,it would be great to link <br /> up different milestones with other events happening in Elk River. The 2 areas I believe a <br /> piece like this would shine are The Rivers Edge Commons park and The Lions Park. I am <br /> very open to location ideas and would be again willing to work with the city to find the best <br /> place. <br /> F. Total Project Cost <br /> The compensation to the selected artist(s) will not exceed$20,000. The artist shall be reimbursed <br /> between 25-50% of upfront costs for materials and the balance upon satisfactory completion <br /> and installation of the artwork. <br /> The artist shall break out the estimated costs as follows: <br /> The cost of materials and installation cannot fully be laid out at this point. It will really depend on the <br /> final size and location of the piece. For some of the materials I would also be approaching some of the local <br /> business that supply large boulders. Hopefully they would be willing to discount or supply these materials. <br />