Laserfiche WebLink
Hillside Park Access <br />Access Comparison <br />Page 2 <br />Preferred <br />Acceptable <br />Not Preferred <br />Item <br />Restricted Access (right in, right out) <br />Tyler Street Access <br />Trott Brook Ext. Access <br />Park Experience (Cont.) <br />Mountain Bike Trails <br />No impact to current mountain bike trails <br />Impacts mountain bike trails in the northwest <br />quadrant of the park (Area 1) <br />Impacts mountain bike trails along the north side <br />of the park (Area 1 & 4) <br />Back Parking Area Access <br />Access remains the same <br />Additional access point is needed to connect <br />Access remains the same <br />Project Costs <br />Design <br />$0 <br />$27,000 <br />$27,000 <br />Right of Way <br />$0 <br />$28,000 for acquisition and impacts to property west <br />of Park <br />$8,000 for necessary changes to existing private <br />driveway easements (3 total) <br />Construction <br />$0 <br />$220,000 (includes asphalt driveway and parking lot) <br />$265,000 (includes asphalt driveway and parking <br />lot) <br />Total Project Costs <br />$0 <br />$275,000 <br />$300,000 <br />