My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.1. SR 01-21-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
01-21-2020
>
9.1. SR 01-21-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 10:03:36 AM
Creation date
1/16/2020 12:56:23 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works: <br />1. Identify all existing utilities and corresponding drainage easements on an updated survey <br />that includes the lot lines shown on the updated plans. <br />This information was included on the original Certificate of Surny, and is shown on the Prehminary Plat. <br />Plat documents continue to show existing easements running beneath proposed buildings <br />and revised stormwater plans outside of existing easements. Update plans to satisfy the <br />requirement. <br />2. A formal agreement for the proposed shared storm sewer system between the two <br />properties must be formalized in an easement and agreement. <br />A formal storm sewer system agreement Wirth easements between the two properties wll be completed during the <br />construction documentsphase. <br />Comment may be satisfied through condition of approval, prior to recording of the final plat. <br />3. Proposed lot lines must have standard drainage and utility easements dedicated. <br />Standard drainage and utility easements slang the proposed lot Braes air included in the ptrhminaay and final <br />pl,11Y. <br />Easements are not shown on the preliminary or final plat. <br />4. Parking bump -outs are not permitted on the public roadway in front of the proposed 4- <br />story apartment building. <br />According to City Code Sec 74-95 —Angle and parallelparking. Angle�iarking may be perr�ritted ors <br />any street by ordinance of the council. Can any such street, every vehicle parked shall be parked with the <br />front of the vehicle facing the curb or the edge of the traveled portion of the street at an angle of <br />approximately 45 degrees. C)n all other sheets, cars shall heparkedparallel to the curb or edge of the <br />roadway in accordance with law. <br />These parallel parking stalls arr requested as part of the PUD. <br />The request roust be approved by the City Council. <br />Sewer service shown off the north end of the 4-story apartment addition building extends off <br />of the proposed lot. All services (sewer and water) must remain within their own lot and <br />connect to the public system in the roadway adjacent to said lot. <br />The existing sanitary sewer service as shown of tl)e north end of the Saxon building ryas for the connection when it <br />bad a septic system. During the construction documents phase, it will be determined if this sanitary service is still <br />necessary. If it is, a new sanitary sewer will be installed within the proposed River Pla.Za lot <br />Plans need to be updated to include all proposed service lines. <br />6. Submit grading plans for the new 4-story apartment site. <br />The prelirrrinarygradingplan has been revised to shoran .spot elevations on the Riverwalk Apartmmentr site. <br />Additional spot elevations, prrposedgrades and contours will be included an the construction documents for both <br />projects <br />Fullgrading plans are required. <br />7. Proposed contours must be shown in all areas. <br />Additional spot elevations, prrposedgrades and contours will be included in the construction documents <br />for both projects <br />Full grading plans are required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.