Laserfiche WebLink
\; <br />TRACT <br />PRGPOSED <br />A_ST(WY <br />APARTMENT <br />TpAIlIINO <br />A-34.058 SF <br />FFE-880-00 <br />GFE-879.50 <br />I <br />I <br />Rm;..rc amuwc <br />rrr-as+ae <br />i <br />1 �i1 <br />I <br />h <br />i PROPO$EO +STORY .a - <br />APARTMENT AWITION <br />y A7,22.Y91 Sr - <br />FFE+887.M GFE.877A0 <br />M1 <br />'k <br />Vt <br />1 a <br />1 � 1 <br />1 CD <br />wn s.s <br />s f rv�+zy, <br />l <br />T ACT CJ <br />A <br />45, <br />NOTES: <br />1. BASE PLAN USED IS A SURVEY PREPARED BY BOGART, PEDERSON <br />& ASSOCIATES. <br />2. ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE �r <br />APPROXIMATE ONLY. CONTRACTOR SHALL CONFIRM ALL LOCATIONS BiR <br />AND ELEVATIONS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL <br />CONTACT UTILITY COMPANIES VIA GOPHER STATE ONE—CALL`d' s= <br />ONLINE OR BY CALLING BIT OR I-800-252-IT66, yE <br />3. ALL CONSTRUCTION SHALL CONFORM TO THE MOST RESTRICTIVE'SI <br />OF THE PROJECT SPECIFICATIONS. THE STANDARD SPECIFICATIONS a s <br />OF THE CITY OF ELK RIVER AND THE LATEST EDITION OF MNDOT s <br />STANDARD SPECIFICATIONS FOR CONSTRUCTION, t <br />F <br />4. THE FOLLOWING SEQUENCE AND PROTOCOLS SHALL BE FOLLOWED �m-v <br />FOR EROSION AND SEDIMENT CONTROL DURING THE SITE p <br />DEVELOPMENT PROCESS' -_ <br />A. INSTALL PERIMETER CONTROLS (SILT FENCE & ROCK <br />CONSTRUCTION ENTRANCE) AS SHOWN ON THE PLANS PRIOR <br />TO START OF WORK. <br />B. SOIL STOCKPILES OR CONCRETE WASHOUTS ARE NOT ALLOWED <br />ON THE PROJECT SITE. <br />C. MAINTAIN ALL TEMPORARY EROSION CONTROL DEVICES IN PLACE Tn <br />UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN Ir Z <br />STABILIZED. INSPECT TEMPORARY EROSION CONTROL DEVICES w <br />ON A. WEEKLY BASIS AND AFTER EACH I/2" OR MORE RAIN ,d <br />EVENT, CLEAN OR MAINTAIN THESE DEVICES AS NEEDED TO BE Cy <br />EFFECTIVE REPLACE DETERIORATED. DAMAGED OR ROTTED z 0 <br />EROSION CONTROL DEVICES IMMEDIATELY. <br />O. REMOVE ALL SOILS AND SEDIMENTS DEPOSITED ONTO PUBLIC ¢ z <br />AND/OR PRIVATE PAVEMENT AREAS WITHIN 24 HOURS OF Er 0.1 <br />DEPOSITION. REMOVAL OF TRACKING MATERIALS SHALL BE <br />COMPLETED AT THE ENO OF EACII WORK DAY WIIEN IT ' <br />OCCURS. SWEEPING MAY BE ORDERED AT ANY TIME IF <br />CONDITIONS WARRANT <br />E. PERFORM SITE REMOVALS, GRADING. EXCAVATION AND <br />EMBANKMENT. SEED AND MULCH ALL DISTURBED AREAS 0L <br />OUTSIDE OF PROPOSED PAVEMENT AND BUILDING AREAS WITHIN <br />72 HOURS OF THIS WORK, N <br />F INSTALL BUILDING AND BITUMINOUS PAVEMENT SECTION FINE <br />GRADE SITE AND RESTORE GREEN AREAS WITH PERMANENT ¢ w <br />VEGETATION PER LANDSCAPE PLANS. <br />G. STORMWATER BMP5 SHALL NOT BE EXCAVATED TO FINAL a 0 <br />GRADE UNTIL CONTRIBUTING DRAINAGE AREA HAS BEEN w cn d <br />CONSTRUCTED AND FULLY STABILIZED. <br />H. REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL Z d <br />DEVICES AFTER SITE HAS UNDERGONE FINAL STABILIZATION aS <br />AND PERMANENT VEGETATION HAS BEEN ESTABLISHED WITH AT IP <br />LEAST 70% COVERAGE <br />Q <br />❑7 <br />;�..W <br />IY W d <br />REVIEW PLAN c z <br />NOT FOR CONSTRUCTION <br />