My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3. SR 01-21-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
01-21-2020
>
7.3. SR 01-21-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 10:00:26 AM
Creation date
1/16/2020 12:52:32 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br />Project Purpose <br />The highway needs reconstruction to address grading, pavement, curb and gutter, ADA and storm <br />sewer issues. <br />Project Description <br />TH 10 reconstruction from Xenia Ave to 4th Street in Elk River and trail construction from Simonet <br />Drive to Lowell Ave. <br />Other activities include: <br />Close Oxford Ave and Norfolk Ave to TH 10. <br />Remove left turn lane to Norfolk Ave. <br />Add second left turn lane and extend turn lanes at Proctor Ave for east bound traffic. <br />Upgrade ADA (Peds & crossings) at Proctor Ave and Upland Ave. <br />Replace signals at Proctor Ave. and Upland Ave. <br />Construct right turn lane on Proctor Ave for north bound traffic (requested by city). <br />Extend street lighting from Proctor Ave to Upland Ave (requested by city). <br />Planned Project Schedule <br />The project is schedule for a 12/18/2020 letting with construction beginning spring/summer 2021. <br />The construction is planned to be completed in 2021. During construction, TH 10 will be reduced <br />to one lane of traffic for east bound while maintaining two lanes of traffic for west bound. <br />City's Estimated Project Costs <br />Some project costs are the City's responsibility, as detailed in MnDOT's cost participation policy. <br />(See the policy and the Cost Participation and Maintenance with Local Units of Government <br />Manual at MnDOT's this website: http://www.dot.state.mn.us/policy/financial/fmO11.html). <br />Attached is MnDOT's current estimate of the City's costs for S.P. 7102-135. <br />The estimate includes costs for signal replacements at Proctor Avenue and Upland Avenue, right <br />turn lane construction for north bound traffic on Proctor Avenue and street lighting replacement and <br />new installations. <br />As shown on the attached, the City of Elk River's total cost participation for SP 7102-135 is <br />currently estimated to be $200,000-$250,000. <br />This estimate does not include engineering, city utility work or trail lighting costs. <br />The total project cost is estimated to be $8,900,000. <br />This project will involve a turn -back of 4th Street NW from Morton Ave to TH 10 once all <br />construction is completed. Image attached. <br />An Equal Opportunity Employer <br />0 0 0 0 0 0 a 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.