My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. SR 01-21-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
01-21-2020
>
4.4. SR 01-21-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 10:00:02 AM
Creation date
1/16/2020 12:39:00 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPLICATION AND CERTIFICATE FOR PAYMENT fAIA DOCUMENT G7021CMa) <br />TO OWNER; PROJECT: APPLICATION NO: TWO (2) Distribution to: <br />City of Elk River Elk {liver Ice Arena & Lion John Weicht Park Facilities OWNER El <br />13065 Orono Parkway NW 1000 School Street NW PERIOD TO: 12-30-19 <br />Elk River, MN 55330 Elk River, MN 55330 CONSTRUCTION MANAGER El <br />CONTRACT DATE: 07-10-19 <br />VIA CONSTRUCTION MANAGER: ARCHITECT <br />FROM CONTRACTOR: RJM Construction, LLC PROJECT NO-. 0 <br />High Five Erectors II, Inc. CONTRACTOR <br />3005 4th Avenue East, P.G. Sox 477 VIA ARCHITECT: <br />Shakopee, MN 55379 292 Desi n Group CONTRACT FOR: Install Steel & Misc. Metals L1 <br />CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, Information and belief the <br />Application is made for payment, as shown below, in connection with the Contract. Work covered by this Application for Payment has been completed in accordance with the Contract Documents, <br />Continuation Sheet, AIA Document G703, is attached. that all amounts have been paid by the Contractor for Work for wich previous Certificates for Payment were <br />1. ORIGINAL CONTRACT SUM ............................................. $ 435,750.00 issued and payments received from the Owner, and that current payment shown herein is now due. <br />"-1 r 2. Net Change by Change Orders ...................................... $ (2,698.15) CONTRACTOR: e � <br />3. CONTRACT SUM TO DATE (Line 9 1-2) .................................. $ 433,051.85 By: _4c'�'�Y! vi Date: '"" I <br />4. TOTAL COMPLETED & STORED TO DATE (column G on 3703).. $ 215,217.00 1. <br />S. RETAINAGE: State af; Minnesota <br />a. 5% of Completed Work County of: Scott <br />(Column D + D on G703) $ 10,760.85 Subscribed and sworn to before <br />b. 0% of Stared Material me this ' `day of Q- 4-u-,— ,r 20_� ��� A.STOCK (Column F on G703) $ <br />Notary Pur7llc. , � 4 (� NOTARY PUBLIC - MINNESOTA <br />��� MY COMNSSION EXPIRES 01)31020 <br />Total Retainage (Lines 5a + 5b or Total in Column I of G703) $ 10,760.85 - <br />My Commission expires: <br />6. TOTAL EARNED LESS RETAINAGE.................................. $ 204,456.15 CERTIFICATE FOR PAYMENT <br />(Line 4 less Line 5 Total) In accordance with the Contract Documents, based on on -site observations and the data comprising this <br />7. LESS PREVIOUS CERTIFICATES FOR PAYMENT ............... $ 168,886.25 application, the Construction Manager and Architect certify to the Owner that to the best of their knowledge, <br />(Line s from prior Certificate) information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the <br />8. CURRENT PAYMENT DUE ................... $ 35,569.9[} Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. <br />9. BALANCE TO FINISH, INCLUDING RETAINAGE ................. <br />(Line 3 less Line 3) $ 228,595.70 <br />CHANGE ORDER SUMMARY <br />ADDITIONS <br />DEDUCTIONS <br />Total Changes approved in previous months by Owner <br />$ <br />$ <br />Total approved this Mono; <br />4,490.00 <br />(6,888,15) <br />GO #1 - PR 2 Lease Space <br />CO #2 - Deduct from Allowance <br />TOTALS <br />$ (2,698.15) <br />$ - <br />NET CHANGES by Change Orders <br />$ (2,698.15) <br />AMOUNT CERTIFIED ............................................. $ <br />{Attach explanation if amount certified diners from the amount applied. iniow aii hguies on this <br />Application and on the Continuation Sheet That are changed 10 Cpnrprrn with the BM*trnt Certified. f <br />CONSTRUCTION MANAGER: <br />By: <br />ARCHITECT; <br />Date: <br />By: Date: <br />This Certificate is not negotiable- The AMOUNT CERTIFIED is payable only to the Contractor named herein. <br />Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor <br />under this Contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.