Laserfiche WebLink
Bid Pacakge: SA <br />Subcontractor: Distinctive <br />Internal Continency Items <br />COR # Date Description <br />Elk River Multipurpose Facility and Park <br />Internal Contingency Tracking Loy <br />RJM Job # 19520-0033 <br />Dated: 9111119 <br />Updated: 1216119 <br />Original Allowance Valuation $15,000.00 <br />FWO # Cost <br />1 na na Precast embed plates and channnel na $4,133.00 <br />2 5 10/28/19 ASI#6 R"T'U Changes na $2,565.00 <br />3 7 1.1/21/19 ASI #14 added Stair Detail at Arena-2 na $6,800.46 <br />4 6 11/21/19 ASI #10 Structural Changes na $8,389.69 <br />Remaining = (h6,888.15) <br />(negative means CO owed) <br />Resulting Distinctive CO to offset Allowance Overages (11/22/19) = $6,888.15 <br />Final Net Difference = $0.00 <br />