My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 2 - STANDARD CONTRACTS <br />13.2The Interconnection Customer shall be responsible for its share of all reasonable <br />expenses, including overheads, associated with (1) owning, operating, maintaining, <br />repairing, and replacing its own Interconnection Facilities, and (2) operating, <br />Facilities. <br /> <br />13.3Distribution Upgrades. The Area EPS Operator shall design, procure, construct, install, <br />and own the Distribution Upgrades described in Attachment 6 of this Agreement. The <br />Area EPS Operator shall provide a good faith estimate cost, including overheads, for <br />the purchase and construction of the Distribution Upgrades and provide a detailed <br />itemization of such costs. If the Area EPS Operator and the Interconnection Customer <br />agree, the Interconnection Customer may construct Distribution Upgrades that are <br />located on land owned by the Interconnection Customer. The actual cost of the <br />Distribution Upgrades, including overheads, shall be directly assigned to the <br />Interconnection Customer. <br /> <br />14 Cost Responsibility for Network Upgrades <br />14.1.Applicability. No portion of Section 14 shall apply unless the interconnection of the <br />Distributed Energy Resource requires Network Upgrades. <br /> <br />14.2.Network Upgrades. The Area EPS Operator or the Transmission Owner shall design, <br />procure, construct, install, and own the Network Upgrades described in Attachment 6 <br />of this Agreement. The Area EPS Operator shall provide a good faith estimate cost, <br />including overheads, for the purchase and construction of the Network Upgrades and <br />provide a detailed itemization of such costs. If the Area EPS Operator and the <br />Interconnection Customer agree, the Interconnection Customer may construct <br />Network Upgrades that are located on land owned by the Interconnection Customer. <br />Unless the Area EPS Operator elects to pay for Network Upgrades, the actual cost of <br />the Network Upgrades, including overheads, shall be borne initially by the <br />Interconnection Customer. <br /> <br />14.3.Repayment of Amounts Advanced for Network Upgrades. The Interconnection <br />Customer shall be entitled to a cash repayment, equal to the total amount paid to the <br />Area EPS Operator and Affected System operator, if any, for Network Upgrades, <br />including any tax gross-up or other tax-related payments associated with the <br />Network Upgrades, and not otherwise refunded to the Interconnection Customer, to <br />be paid to the Interconnection Customer on a dollar-for-dollar basis for the non- <br />usage sensitive portion of transmission charges, as payments are made under the <br />Area EPS Operato <br />respect to the Distributed Energy Resource. Any repayment shall include interest <br />Municipal Minnesota Interconnection Agreement _ January 2019 9 <br /> <br />109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.