My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 2 - STANDARD CONTRACTS <br /> <br />3Parallel Operation Obligations <br />3.1.Once the Distributed Energy Resource has been authorized to commence parallel <br />operation, the Interconnection Customer shall abide by all rules and procedures <br />pertaining to the parallel operation of the Distributed Energy Resource in the <br />applicable control area, including, but not limited to; 1) the rules and procedures <br />concerning the operation of generation set forth by the applicable system <br />bution System provided or referenced <br />in an attachment to this Agreement and; 2) the Operating Requirements set forth in <br />Attachment 5 of this Agreement. The Minnesota Technical Requirements for <br />interconnection are covered in a separate document, a copy of which has been <br />made available to the Interconnection Customer and incorporated and made part of <br />this Agreement by this reference. <br /> <br />4Metering <br />4.1.As described in M-MIP Overview Process Section 9.1, the Interconnection Customer <br />shall be responsible for the Area EP <br />the purchase, installation, operation, maintenance, testing, repair, and replacement <br />of metering and data acquisition equipment specified in Attachments 2 and 3 of this <br />s metering (and data acquisition, as <br />required) equipment shall conform to applicable industry rules and Operating <br />Requirements. <br /> <br />5Distributed Energy Resource Capabilities and Grid Reliability <br />5.1.The Minnesota Technical Requirements outlines the Parties responsibilities <br />consistent with IEEE 1547 Standard for Interconnection and Interoperability of <br />Distributed Energy Resources with Associated Electric Power Systems Interfaces <br />which provides requirements relevant to the interconnection and interoperability <br />performance, operation and testing, and, to safety, maintenance and security <br />considerations. <br />5.2.The Area EPS Operator may offer the Interconnection Customer the option to utilize <br />required DER capabilities to mitigate Interconnection Customer costs related to <br />Upgrades or Interconnection Facilities to address anticipated system impacts from <br />the engineering review (i.e. Initial Review, Supplemental Review, or Study Process <br />described in the M-MIP.) <br /> <br />Municipal Minnesota Interconnection Agreement _ January 2019 4 <br /> <br />104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.