My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 2. -CONNECTION TO WATER SYSTEM <br />Sec. 78-21. -Connection required. <br />Sec. 78-22. -Notice to connect; installation of connection bycity. <br />Sec. 78-23. -Location of and access to stop valves. <br />Sec. 78-24. -Location of and access to meters. <br />Sec. 78-25. -Disconnection from water system. <br />Sec. 78-26. -Private wells for domestic use. <br />Secs. 78-2778-30. -Reserved. <br />Sec. 78-21. -Connection required. <br />The following buildings shall be required to be connected to the city water utility: <br />(1)All buildings connected to the water utility on the date of adoption of the ordinance from <br />which this article is derived shall remain connected to the water utility for so long as the building is <br />occupied or used for any purpose. <br />(2)All buildings constructed after such date on property to which water utility service is available <br />at the time a certificate of occupancy is issued for the building shall be required to connect to the <br />water utility prior to occupancy. <br />(3)All buildings constructed after such date on property to which water utility service becomes <br />available following legal occupancy of the building shall be required to connect to the water utility <br />as follows: <br />a.All residential buildings with one or two residential units shall be required to connect to <br />the water utility within two years from the date water utility service becomes available to the <br />property or the date the property is assessed for water utility improvements, whichever is <br />later. <br />b.All other buildings shall be required to connect to the water utility within 90 days from <br />the date water utility service becomes available to the property. <br />(4)All buildings existing on the date of adoption of the ordinance from which this article is <br />derived on property to which water utility service becomes available after such date shall be <br />required to be connected to the water utility as follows: <br />a.All residential buildings with one or two residential units shall be required to connect to <br />the water utility within two years from the date water utility service becomes available to the <br />property or the date the property is assessed for water utility improvements, whichever is <br />later. <br />b.All other buildings shall be required to connect to the water utility within 90 days from <br />the date water utility service becomes available to the property. <br />(5)All buildings existing on the date of adoption of the ordinance from which this article is <br />127 <br />521 <br />
The URL can be used to link to this page
Your browser does not support the video tag.