My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16.This contract becomes effective as soon as it is signed by the QF and the Utility. <br />This contract will remain in force until either the QF or the Utility gives written notice <br />to the other that the contract is canceled. This contract will be canceled thirty (30) <br />days after notice is given.I f the listed electric generating facilities are not <br />contract being signed by the QF and the Utility, the contract terminates. The QF <br />and the Utility may delay termination by mutual agreement. <br />17.Neitherthe QF nor the Utility will be considered in default as to any obligation if the <br />QF or the Utility is prevented from fulfilling the obligation due to an act of God, labor <br />disturbance, act of public enemy, war, insurrection, riot, fire, storm or flood, <br />explosion, breakage or accident to machinery or equipment, an order, regulation or <br />restriction imposed by governmental, military or lawfully established civilian <br />Utility.However, the QF or <br />Utility whose performance under this contract is hindered by such an event shall <br />make all reasonable efforts to perform its obligations. <br />18.This contract can only be amended or modified by mutual agreement in writing <br />signed by the QF and the Utility. <br />19.The QF must notify the Utility prior to any change in the electric generating <br />process adopted by the Utility. <br />20.Termination of this contract is allowed (i) by the QF at any time without restriction; <br />(ii) by Mutual Agreement between the Utilityand the QF; (iii) upon abandonment or <br />removal of electric generating facilities by the QF; (iv) by the Utility if the electric <br />generating facilities are continuously non-operational for any twelve (12) <br />consecutive month period; (v) by the Utilityif the QF fails to comply with applicable <br />interconnection design requirements or fails to remedy a violation of the <br />interconnection process; or (vi) by the Utility upon breach of this contract by the QF <br />unless cured with notice of cure received by the Utility prior to termination. <br />21.In the event this contract is terminated, the Utility shall have the rights to disconnect <br />its facilities or direct the QF to disconnect its generating facilities. <br />22.This contract shall continue in effect after termination to the extent necessary to <br />allow either the Utility or the QF to fulfill rights or obligations that arose under the <br />contract. <br />23.Transfer of ownership of the generating facilities shall require the new owners and <br />the Utility to execute a new contract. Upon the execution of a new contract with the <br />new owners this contract shall be terminated. <br />88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.